Railway Transportation
Published by Shennen Publishing & Publicity Co.
from October, 1951 to December, 1974

This listing was compiled from the indexes of major articles appearing in that magazine.
Copies are available for reference at the Railway Resource Centre and major Public Libraries throughout Australia.
To obtain a reference to a subject on this site, use your browser's FIND facility
|
RAILWAY |
ARTICLE TITLE |
MONTH |
YEAR |
|
Commonwealth Railways |
1750 hp Diesels for Diverse Jobs |
February |
1956 |
|
Commonwealth Railways |
1971-2: Traffic Drop Affects All sections |
October |
1973 |
|
Commonwealth Railways |
Air Conditioning Equipment for Transcontinental Cars |
April |
1969 |
|
Commonwealth Railways |
Annual Report 1973-74: Service Changes Erode Profit |
November |
1974 |
|
Commonwealth Railways |
Australia's Heaviest Coal Trains |
February |
1968 |
|
Commonwealth Railways |
Automatic Diesel Loco Refuelling |
December |
1961 |
|
Commonwealth Railways |
Canberra's New Terminal |
March |
1967 |
|
Commonwealth Railways |
CR Faces Financial Difficulties (1969/70 report) |
August |
1971 |
|
Commonwealth Railways |
CR gears up for Mammoth Coal Haul up New Line |
September |
1957 |
|
Commonwealth Railways |
Creating a New Public Image |
October |
1962 |
|
Commonwealth Railways |
Diesels Slash ""Trans"" Line Operating Costs |
May |
1963 |
|
Commonwealth Railways |
Double Length Cattle Vans (CC-Class) |
April |
1963 |
|
Commonwealth Railways |
Dusty Conditions Await CR's MDH-class d/h locos |
November |
1958 |
|
Commonwealth Railways |
Efficiency in the Diesel Shop |
April |
1957 |
|
Commonwealth Railways |
Extra Amenities for Lonely Outposts |
June |
1963 |
|
Commonwealth Railways |
Extra-Long. Large Capacity Rolling Stock |
February |
1966 |
|
Commonwealth Railways |
First Full Scale Concrete Sleeper Installation |
October |
1972 |
|
Commonwealth Railways |
First Net Loss in 10 Years (1970/71 report) |
July |
1972 |
|
Commonwealth Railways |
Freight Transhipment at Alice Springs |
October |
1959 |
|
Commonwealth Railways |
Giant Tank Cars for Loco Fuel (TOG-class) |
August |
1966 |
|
Commonwealth Railways |
Giant Transporter for Rolling Stock |
June |
1967 |
|
Commonwealth Railways |
Laying Track the Pre-fab Way |
November |
1960 |
|
Commonwealth Railways |
Luxurious Equipment for East/West Service |
February |
1970 |
|
Commonwealth Railways |
Luxury Equipment to Meet ""Trans"" Traffic Build Up |
August |
1964 |
|
Commonwealth Railways |
Modern Methods, Equipment Forge Latest Rail Link |
September |
1956 |
|
Commonwealth Railways |
More Luxury Air-conditioned Cars Ordered for Desert Run |
June |
1957 |
|
Commonwealth Railways |
New Complete Trains for Transcontinental |
January |
1953 |
|
Commonwealth Railways |
New Diesel Power Re-writes Trans Timetable (GM-1 Class) |
November |
1951 |
|
Commonwealth Railways |
New Glamour for the Trans Australian |
May |
1961 |
|
Commonwealth Railways |
New Motive Power will Revolutionise Life in the Centre |
June |
1954 |
|
Commonwealth Railways |
New Railway's Part in S.A.'s Industrial Growth |
September |
1954 |
|
Commonwealth Railways |
North Australia Line Upgraded for Iron Ore Traffic |
May |
1969 |
|
Commonwealth Railways |
NT-Class Diesels Have High Power/Weight Ratio |
September |
1965 |
|
Commonwealth Railways |
Operation on Australia's First All-Diesel Road |
March |
1953 |
|
Commonwealth Railways |
Rail Carriers for Piggyback Traffic |
September |
1970 |
|
Commonwealth Railways |
RDCs Bring New Era to Desert Country |
October |
1951 |
|
Commonwealth Railways |
Reconstruction of ""Trans"" Communication Line |
January |
1966 |
|
Commonwealth Railways |
Road-Rail Cooperation Gets Results |
May |
1959 |
|
Commonwealth Railways |
Sleeper/Dinette Cars for Piggyback Drivers |
September |
1966 |
|
Commonwealth Railways |
Stainless Steel Passenger Cars for ""Trans"" |
December |
1966 |
|
Commonwealth Railways |
Ten-Year Track Rehabilitation Program |
May |
1965 |
|
Commonwealth Railways |
Traffic Rise Benefits Finances (1968/69 report) |
July |
1970 |
|
Commonwealth Railways |
Unique Piggy-back Operations at Stirling North |
August |
1957 |
|
Commonwealth Railways |
What a Way ...... to Run a Railroad! |
August |
1955 |
|
Commonwealth Railways |
Wheel Truing Machine Cuts Vehicle ""Downtime"" |
June |
1960 |
|
Commonwealth Railways |
Will Concrete Sleepers Lower Maintenance Costs |
July |
1971 |
|
N. S. W. Government Railways |
""The Ned Kelly Special"" |
November |
1969 |
|
N. S. W. Government Railways |
""Three Minutes to Gosford"" |
November |
1963 |
|
Public Transport Comm. of NSW |
$8 Million Tunnelling Contract (Edgecliff) |
July |
1972 |
|
N. S. W. Government Railways |
£29 Million Line for Eastern Suburbs Recommended |
December |
1963 |
|
N. S. W. Government Railways |
10-Year Future Development Plan |
September |
1956 |
|
N. S. W. Government Railways |
1750 h.p. Diesels for Diverse Jobs (42-class) |
February |
1956 |
|
N. S. W. Government Railways |
180 Tons Handled with Ease |
December |
1962 |
|
N. S. W. Government Railways |
1955-60: NSWGR's Most Important Years |
September |
1960 |
|
N. S. W. Government Railways |
40-ton Capacity High Speed Coal Hoppers (BCH Class) |
December |
1951 |
|
N. S. W. Government Railways |
89% of Flood-battered Tracks Rebuilt in Four Weeks |
May |
1955 |
|
N. S. W. Government Railways |
A New Comet Across the Desert |
January |
1954 |
|
N. S. W. Government Railways |
A New Deal for Livestock Transport (BSV/BCW cars) |
February |
1961 |
|
N. S. W. Government Railways |
Additional Tracks will Beat Bottleneck (Granville) |
January |
1959 |
|
N. S. W. Government Railways |
Advertising Can Build Up Off-peak Travel |
March |
1957 |
|
N. S. W. Government Railways |
After 2 Years: How Good is the Southern Aurora? |
April |
1964 |
|
N. S. W. Government Railways |
Air Rights Leased at Busy Suburban Station |
April |
1957 |
|
N. S. W. Government Railways |
Air Rights over Rail Tracks Sold to Lift Revenue |
September |
1958 |
|
N. S. W. Government Railways |
Air Spring Bogies for Double Deck Cars |
June |
1972 |
|
N. S. W. Government Railways |
Air Spring Bogies for Double Deck Interurbans |
April |
1970 |
|
N. S. W. Government Railways |
Air Spring Power Bogies for Suburban Cars |
August |
1968 |
|
N. S. W. Government Railways |
All Purpose D/e Locomotives (40 class) |
January |
1952 |
|
N. S. W. Government Railways |
Aluminium Coal Hopper Wagons (CH-class) |
July |
1966 |
|
N. S. W. Government Railways |
Aluminium Railcars Cut Riverina Express Schedules |
March |
1972 |
|
N. S. W. Government Railways |
American Characteristics in New Mikados (59-class) |
October |
1952 |
|
N. S. W. Government Railways |
Annual Report 1971-2: Paradoxial Situation |
August |
1973 |
|
N. S. W. Government Railways |
Are the Railways a Burden on the States? (Winsor) |
February |
1953 |
|
N. S. W. Government Railways |
Attractive Refrigerator Cars for NSW (TRC Class) |
November |
1951 |
|
N. S. W. Government Railways |
Australian-built Budd RDC Railcars |
April |
1961 |
|
N. S. W. Government Railways |
Australia's Biggest Steam Locomotive (60-class) |
September |
1952 |
|
N. S. W. Government Railways |
Australia's First Interurban M.U. Cars |
February |
1954 |
|
N. S. W. Government Railways |
Australia's Largest Air Rights Project |
March |
1963 |
|
N. S. W. Government Railways |
Balmain Coal Loading Plant |
February |
1964 |
|
N. S. W. Government Railways |
BD-class Open Wagons |
June |
1962 |
|
N. S. W. Government Railways |
Big Trains Speed Track Renewals |
October |
1964 |
|
N. S. W. Government Railways |
Bogie Cars Hasten Wheat Harvest (BWH-class) |
May |
1954 |
|
N. S. W. Government Railways |
Brakevan Modernisation Plan (OHG & NHG classes) |
September |
1966 |
|
N. S. W. Government Railways |
Budd Styling Enhances Interurban Cars |
May |
1958 |
|
N. S. W. Government Railways |
Build-it-Yourself Station (Lapstone) |
August |
1964 |
|
N. S. W. Government Railways |
Carrier Links are Vital Communication Factors |
September |
1963 |
|
N. S. W. Government Railways |
Caterpillar Powered Shunters Replace Steam Locos |
October |
1971 |
|
N. S. W. Government Railways |
Caterpillar-Powered Shunters (70-class) |
November |
1960 |
|
N. S. W. Government Railways |
Centreless Wheel Lathe Reduces Loco Down-Time |
May |
1965 |
|
N. S. W. Government Railways |
Clinic Cars Bring Good Health to Outback Children |
July |
1960 |
|
N. S. W. Government Railways |
Clyde G8s for Long-haul Duties (49class) |
December |
1960 |
|
N. S. W. Government Railways |
Coal Discharging Plant at Balmain (Sydney) |
February |
1953 |
|
N. S. W. Government Railways |
Coal, Wheat Tonnages at Record Level (1969/70 report) |
April |
1971 |
|
Public Transport Comm. of NSW |
Colourful Ceremonies Inaugurate Gold Coast Motorail Service |
June |
1973 |
|
N. S. W. Government Railways |
Completion of Underground City Link |
December |
1955 |
|
N. S. W. Government Railways |
Country Travel Boosted by Fast Diesel Trains |
October |
1953 |
|
Public Transport Comm. of NSW |
Decisions on Sydney's Urban Projects Becoming Urgent |
March |
1974 |
|
N. S. W. Government Railways |
Desperate Water Lift by Railways (Broken Hill) |
May |
1952 |
|
N. S. W. Government Railways |
Detailed Planning in Standard Gauge Publicity Campaign |
June |
1962 |
|
N. S. W. Government Railways |
Diesel Electrics Wheel Tonnage Fast (Freight) |
December |
1952 |
|
N. S. W. Government Railways |
Diesel Railcar Fleet Expanded |
April |
1964 |
|
N. S. W. Government Railways |
Diesel-Powered Air-Conditioned Trains (4-car) |
December |
1951 |
|
N. S. W. Government Railways |
Display Car for Captain Cook Bi-centenary |
August |
1970 |
|
N. S. W. Government Railways |
Door-to-Door Piggyback Services |
July |
1966 |
|
N. S. W. Government Railways |
Double Crossing Loops (Broken Hill Line) |
December |
1970 |
|
N. S. W. Government Railways |
Double Deck Suburban Trailer Cars |
March |
1964 |
|
N. S. W. Government Railways |
Double Track Locations Aid Train Movement |
March |
1953 |
|
N. S. W. Government Railways |
Double-Deck Cars to Beat Suburban Track Saturation |
November |
1962 |
|
N. S. W. Government Railways |
Early Start for City Section of Eastern Suburbs Line |
August |
1969 |
|
Public Transport Comm. of NSW |
Eastern Suburbs Rail Viaduct Straddles New Road Tunnels |
May |
1974 |
|
N. S. W. Government Railways |
Eastern Suburbs Railway - Additional Details |
October |
1967 |
|
N. S. W. Government Railways |
Ebasco Plan to Save £9.5m a Year |
January |
1958 |
|
N. S. W. Government Railways |
Electric Locos. Interurbans Take Over on Gosford Line |
February |
1960 |
|
N. S. W. Government Railways |
Electric Power to Speed Trains on Mountain Grades |
March |
1957 |
|
N. S. W. Government Railways |
Electric Power will cut ""Hawkesbury Horrors"" |
March |
1958 |
|
N. S. W. Government Railways |
Electrification Comes Closer to the Blue Mountains |
April |
1955 |
|
N. S. W. Government Railways |
Electrification Extended (Liverpool-Campbelltown) |
June |
1968 |
|
N. S. W. Government Railways |
Electronic Equipment Raises Train Control Efficiency |
February |
1962 |
|
N. S. W. Government Railways |
Enfield Freight Yard Has Growing Pains |
January |
1955 |
|
N. S. W. Government Railways |
Extensive Trackage Project (Lidcombe - Blacktown) |
June |
1952 |
|
N. S. W. Government Railways |
Flame Hardening Prolongs Rail Life |
March |
1964 |
|
N. S. W. Government Railways |
Gondola Cars for Fast Freight (G-class) |
November |
1951 |
|
N. S. W. Government Railways |
Gosford Electrification will end Steam |
December |
1958 |
|
N. S. W. Government Railways |
Government Approval for Eastern Suburbs Railway |
April |
1967 |
|
N. S. W. Government Railways |
Hallade Track Recorder Car Pins Down Track Flaws |
August |
1953 |
|
N. S. W. Government Railways |
Heavy Duty Goodwin-Alco Diesels (45-class) |
January |
1963 |
|
N. S. W. Government Railways |
High Availability with Alco-GE Locos |
June |
1952 |
|
N. S. W. Government Railways |
Higher Costs Result in Heavy Loss (1968/69 report) |
April |
1970 |
|
N. S. W. Government Railways |
Housing Projects Influence Commuter Travel Trends |
September |
1954 |
|
N. S. W. Government Railways |
Improved Accommodation for Track Workers |
May |
1969 |
|
N. S. W. Government Railways |
Improved Buffet Service for Overnight Trains |
July |
1964 |
|
N. S. W. Government Railways |
Improved Riding Conditions in new Brakevan (JHG-class) |
November |
1969 |
|
N. S. W. Government Railways |
Improved Services Bring Promise of Extra Business |
April |
1962 |
|
N. S. W. Government Railways |
In-Situ Wheel Truing Gives Faster Overhauls |
August |
1962 |
|
Public Transport Comm. of NSW |
Integration of Sydney's Transport Systems |
April |
1974 |
|
N. S. W. Government Railways |
Interstate Expresses Diverted |
February |
1966 |
|
N. S. W. Government Railways |
Is There an Answer to the Rail Corrugation Problem? |
June |
1959 |
|
N. S. W. Government Railways |
Keeping Suburban Trains ""On the Move"" |
February |
1963 |
|
N. S. W. Government Railways |
Labour Costs Cause Huge Loss (1970/71 report) |
January |
1972 |
|
N. S. W. Government Railways |
Lifting Locomotives with Water |
September |
1956 |
|
N. S. W. Government Railways |
Loco Front-end Tests May Boost Steam Power |
March |
1958 |
|
N. S. W. Government Railways |
Long Range Tests for Concrete Sleepers |
August |
1970 |
|
N. S. W. Government Railways |
Long Viaduct for Eastern Suburbs Line (Woolloomooloo) |
June |
1969 |
|
N. S. W. Government Railways |
Louvres and Brake Vans for Fast Freights |
January |
1952 |
|
N. S. W. Government Railways |
Luxury Booking Office at Sydney Station |
December |
1964 |
|
N. S. W. Government Railways |
Luxury Double Deck Interurban Cars |
July |
1970 |
|
N. S. W. Government Railways |
Luxury Sleeping Cars |
June |
1961 |
|
N. S. W. Government Railways |
Luxury Standard Gauge Trains Among World's Best |
April |
1962 |
|
N. S. W. Government Railways |
Luxury trains for Sydney-Melbourne Service |
December |
1959 |
|
N. S. W. Government Railways |
Mechanical Cheque Handling Procedure Introduced |
August |
1953 |
|
N. S. W. Government Railways |
Medium Powered Diesels for Branch Lines (48-class) |
November |
1959 |
|
N. S. W. Government Railways |
Modern Electric and Diesel Loco. Depot, Enfield |
October |
1957 |
|
N. S. W. Government Railways |
Modernisation at Enfield Freight Yard |
June |
1960 |
|
N. S. W. Government Railways |
More Accommodation for ANZR Research Library |
March |
1964 |
|
N. S. W. Government Railways |
More Diesels Ordered (44-class) |
April |
1957 |
|
N. S. W. Government Railways |
More Flexibility at Remodelled Terminus (Penrith) |
March |
1957 |
|
N. S. W. Government Railways |
Most Powerful Locomotives in Australia (46-class) |
August |
1956 |
|
N. S. W. Government Railways |
Moving a Pipeline by rail |
August |
1965 |
|
N. S. W. Government Railways |
Moving Wheat is a Year-long Task in N.S.W. |
November |
1956 |
|
N. S. W. Government Railways |
Nation's Largest Breakdown Crane |
July |
1962 |
|
N. S. W. Government Railways |
New Air-conditioned Trains Bring More Passengers |
April |
1952 |
|
N. S. W. Government Railways |
New Bridges on Sydney-Newcastle Line |
April |
1958 |
|
N. S. W. Government Railways |
New Facilities Lift Track Capacity on Steep Grade |
October |
1956 |
|
N. S. W. Government Railways |
New Gateway to Silver City |
July |
1957 |
|
N. S. W. Government Railways |
New Identifying Letter Symbol |
December |
1969 |
|
N. S. W. Government Railways |
New Life for Obsolete Cars |
April |
1959 |
|
N. S. W. Government Railways |
New Luxury Trains for Brisbane Service |
June |
1956 |
|
Public Transport Comm. of NSW |
New OCX, OCY Container Wagons for NSWPTC |
December |
1973 |
|
Public Transport Comm. of NSW |
New Series 2-deck Cars for Eastern Suburbs Line |
December |
1973 |
|
N. S. W. Government Railways |
New Streamlined Dual Service Diesels (43-class) |
February |
1957 |
|
N. S. W. Government Railways |
New Terminals Speed Standard Gauge Traffic |
April |
1962 |
|
N. S. W. Government Railways |
Non-metallic Brake Blocks |
May |
1957 |
|
N. S. W. Government Railways |
NSWGR Extends Electrification Westwards (Penrith) |
December |
1955 |
|
Public Transport Comm. of NSW |
NSWPTC Completes its Dieselisation Program - 47-class |
May |
1973 |
|
N. S. W. Government Railways |
Parkes-Broken Hill Upgrading - Special report |
July |
1967 |
|
N. S. W. Government Railways |
Passenger Cars Ordered and More Trains Planned |
August |
1954 |
|
N. S. W. Government Railways |
Pioneer Electric Locomotive (45-class) |
August |
1952 |
|
Public Transport Comm. of NSW |
Planning the New Rail Parcels Handling Depot at Central, Sydney |
December |
1973 |
|
Public Transport Comm. of NSW |
Post Tensioned Concrete Viaduct (Woolloomooloo) |
July |
1972 |
|
N. S. W. Government Railways |
Prestressed Concrete Bridge Beams |
November |
1957 |
|
N. S. W. Government Railways |
Preventing End Movement (BME Bolster Wagons) |
February |
1963 |
|
N. S. W. Government Railways |
Production Line Methods for Mast Erection |
May |
1967 |
|
N. S. W. Government Railways |
Prototype Diesel Shunter (72-class) |
July |
1964 |
|
N. S. W. Government Railways |
Prototype Diesel-Hydraulic Shunting Loco (72-Class) |
December |
1965 |
|
N. S. W. Government Railways |
Prototype Double Deck Suburban Cars |
January |
1969 |
|
N. S. W. Government Railways |
Prototype Insulated Containers |
April |
1969 |
|
N. S. W. Government Railways |
Rail Connections for Wheat Exporting |
August |
1967 |
|
N. S. W. Government Railways |
Rail Link for Industrial Development |
August |
1966 |
|
Public Transport Comm. of NSW |
Rail Museum Opens its Doors |
December |
1972 |
|
N. S. W. Government Railways |
Rail Team Complete ""Impossible"" Task |
July |
1963 |
|
N. S. W. Government Railways |
Rail Terminal for Port Kembla Coal Loader |
May |
1964 |
|
N. S. W. Government Railways |
Rail/Road Bus for Outback Lines |
June |
1969 |
|
N. S. W. Government Railways |
Railbus Tested on Light Traffic Branchline |
October |
1970 |
|
N. S. W. Government Railways |
Redevelopment Planned for Sydney Station |
August |
1963 |
|
Public Transport Comm. of NSW |
Relay Interlocking for Four Tracks (Hanbury) |
September |
1972 |
|
N. S. W. Government Railways |
Replacing Flood-wrecked Signal Equipment |
February |
1957 |
|
N. S. W. Government Railways |
Replacing Outmoded Signal Equipment (Blacktown) |
August |
1956 |
|
N. S. W. Government Railways |
Replacing Steam on the Blue Mountains |
July |
1956 |
|
N. S. W. Government Railways |
Rolling Stock Converted for Specialised Traffic |
November |
1966 |
|
N. S. W. Government Railways |
Royal Trains Readied |
February |
1954 |
|
Public Transport Comm. of NSW |
SATS Plan for Sydney's Future Urban Railway Expansion |
June |
1974 |
|
N. S. W. Government Railways |
School Clubs Encourage Rail Interest |
October |
1962 |
|
Public Transport Comm. of NSW |
Short Term Recommendations for Suburban Services |
August |
1972 |
|
N. S. W. Government Railways |
Single Line Automatic Signals Have No Troubles |
January |
1953 |
|
N. S. W. Government Railways |
Special NSWGR Centenary Issue |
September |
1955 |
|
N. S. W. Government Railways |
Special Stock for Car Haulage Business |
January |
1959 |
|
N. S. W. Government Railways |
Specialised Equipment for Double Deck Power Cars |
July |
1967 |
|
N. S. W. Government Railways |
Spectrograph to Pin-point Diesel Engine Wear |
September |
1958 |
|
N. S. W. Government Railways |
Speeding Ticket Issuing Through Mechanisation |
June |
1956 |
|
N. S. W. Government Railways |
Spit and Polish for Suburban Cars |
March |
1960 |
|
Public Transport Comm. of NSW |
Stainless Steel Double Deck Power Cars |
December |
1972 |
|
N. S. W. Government Railways |
Standard Gauge services Inaugurated |
February |
1962 |
|
N. S. W. Government Railways |
Stylish Sleepers for Queensland Run |
November |
1954 |
|
N. S. W. Government Railways |
Suburban Air-Rights Development (Hurstville) |
December |
1965 |
|
N. S. W. Government Railways |
Sunday Tour Trains Show Faraway Places |
January |
1954 |
|
N. S. W. Government Railways |
Switch to Diesels on North Coast Planned |
February |
1958 |
|
Public Transport Comm. of NSW |
Sydney Market Complex will Boost Produce Rail Traffic |
May |
1974 |
|
N. S. W. Government Railways |
Sydney Shows How in Mass Transport |
June |
1958 |
|
N. S. W. Government Railways |
Sydney's New Underground and Surface Railways |
March |
1952 |
|
N. S. W. Government Railways |
Symmetrical Designs is Feature of New Road-Switcher |
November |
1953 |
|
N. S. W. Government Railways |
Taking a Bolder Stand on the Pollution Issue |
November |
1971 |
|
N. S. W. Government Railways |
Technological Progress Brings Fuel Economies |
June |
1964 |
|
N. S. W. Government Railways |
Test Run Observation (40 class) |
March |
1952 |
|
N. S. W. Government Railways |
The Snowline is Closer (4-car Diesel Trains) |
June |
1955 |
|
N. S. W. Government Railways |
Third Largest Prestressed Concrete Bridge |
July |
1967 |
|
N. S. W. Government Railways |
Tickets without Tears Sydney Station) |
November |
1952 |
|
N. S. W. Government Railways |
Tight Schedules Trimmed by Fast Running Pacifics |
April |
1954 |
|
N. S. W. Government Railways |
Tinplate Express - a New Freight Concept |
May |
1960 |
|
N. S. W. Government Railways |
Track Quadruplication (Strathfield - Hornsby) |
February |
1952 |
|
N. S. W. Government Railways |
Track Recording Car Pinpoints Maintenance Needs |
June |
1962 |
|
N. S. W. Government Railways |
Track Relaying in Australia's Longest Tunnel |
March |
1961 |
|
N. S. W. Government Railways |
Track Strengthening to Move Heavy Steel Traffic |
November |
1961 |
|
N. S. W. Government Railways |
Transfer Facilities at Albury |
June |
1953 |
|
N. S. W. Government Railways |
Trouble-Free Bridge Launching |
November |
1954 |
|
N. S. W. Government Railways |
Twin-cab Design for Most Powerful Diesels (422-class) |
September |
1969 |
|
N. S. W. Government Railways |
Two Major Deviations on NSWGR Tracks |
September |
1961 |
|
N. S. W. Government Railways |
Ultrasonic Rays Detect Hidden Rail Flaws |
September |
1953 |
|
N. S. W. Government Railways |
Vending Machines with Electric Brains |
December |
1953 |
|
N. S. W. Government Railways |
Western Endeavour - The History Maker |
October |
1970 |
|
N. S. W. Government Railways |
White Power for Mountain Haul (Electrification) |
July |
1952 |
|
N. S. W. Government Railways |
Zero Hour on the Coal Haul (Steam on the Blue Mountains) |
October |
1951 |
|
New Zealand Railways |
""Off the Hook"" Diesels for NZR (Da-class) |
August |
1956 |
|
New Zealand Railways |
£85,000 Rail-Road Passenger Terminal (Rotorua) |
August |
1961 |
|
New Zealand Railways |
1 Million Transfer Yard |
February |
1963 |
|
New Zealand Railways |
100 Years of Rail Service |
December |
1963 |
|
New Zealand Railways |
40 Years of Electric Traction |
September |
1963 |
|
New Zealand Railways |
A ""Hole through a Hill"" is opened - Part 1 |
January |
1956 |
|
New Zealand Railways |
A ""Hole through a Hill"" is opened - Part 2 |
February |
1956 |
|
New Zealand Railways |
All-line Availability for NZR Diesels (Dg-class) |
May |
1956 |
|
New Zealand Railways |
Aluminium-panelled Postal and Heating Vans |
November |
1963 |
|
New Zealand Railways |
Annual Report 1972-73: Tonnage Up - Deficit Reduced |
February |
1974 |
|
New Zealand Railways |
Bridge over Flood Channel |
August |
1966 |
|
New Zealand Railways |
Bridge Renewals Cut Running Time |
January |
1962 |
|
New Zealand Railways |
Bright Future Predicted for NZR |
August |
1971 |
|
New Zealand Railways |
Capital Fund Flow Vital for NZR Economics |
December |
1969 |
|
New Zealand Railways |
Changes in River Levels Forecast Floods |
June |
1957 |
|
New Zealand Railways |
Cleanliness Comes First at Parnell Diesel Depot |
September |
1957 |
|
New Zealand Railways |
Colourful Displays Mark NZR Centenary |
February |
1964 |
|
New Zealand Railways |
CTC Installed to cut Working Cost |
June |
1957 |
|
New Zealand Railways |
Curves Eased on Matawatu Line to Speed Trains |
October |
1958 |
|
New Zealand Railways |
Data Processing Speeds Wage Accounting |
March |
1963 |
|
New Zealand Railways |
Dsc-class Diesel Electric Shunters |
May |
1963 |
|
New Zealand Railways |
Dual Purpose Diesels for Shunting and Mainline Duties |
February |
1960 |
|
New Zealand Railways |
Dual Service Diesel Power for Busy Mainline |
February |
1955 |
|
New Zealand Railways |
Electric Locomotives for South Island Service (Ea-class) |
February |
1969 |
|
New Zealand Railways |
Electrification Heads Big Programme of Future NZR Works |
December |
1951 |
|
New Zealand Railways |
Electrifying the Hutt Valley |
November |
1955 |
|
New Zealand Railways |
Endeavour - An Appropriately Named Train |
February |
1973 |
|
New Zealand Railways |
Fifty Years of NZR's Main Trunk Express Services |
June |
1959 |
|
New Zealand Railways |
First Stage of Hutt Valley Electrification |
January |
1954 |
|
New Zealand Railways |
Flood-Ravaged Bridge Replaced in Record Time |
July |
1966 |
|
New Zealand Railways |
General Electric Delivers ""Super Power"" Diesels to NZR - DX-Class |
February |
1973 |
|
New Zealand Railways |
Healthy Rise in Profitability (1969/70 report) |
January |
1971 |
|
New Zealand Railways |
Hitachi-built Shunting Tractors |
July |
1970 |
|
New Zealand Railways |
Impressive Diesel Motive Power Fleet Part 1 |
April |
1971 |
|
New Zealand Railways |
Impressive Diesel Motive Power Fleet Part 2 |
June |
1971 |
|
New Zealand Railways |
Improved Inter-city Service |
June |
1968 |
|
New Zealand Railways |
Inspiration and Pride Moulded a Royal Train |
April |
1954 |
|
New Zealand Railways |
Inter-Island Ferry Links Isolated Systems |
May |
1962 |
|
New Zealand Railways |
It's Green All the Way for the Silver Star |
November |
1971 |
|
New Zealand Railways |
Japan to Supply Electric Locos (Ea-class) |
October |
1967 |
|
New Zealand Railways |
Junction Station Rebuilt (Woodville) |
January |
1967 |
|
New Zealand Railways |
Latest NZR Freight Rolling Stock |
December |
1961 |
|
New Zealand Railways |
Local Design Refrigerator Cars |
April |
1958 |
|
New Zealand Railways |
Low Powered Diesel Shunters (Dsa-class) |
March |
1957 |
|
New Zealand Railways |
Luxury Expresses Planned |
November |
1967 |
|
New Zealand Railways |
Luxury Rail Travel is Cheaper in New Zealand |
April |
1973 |
|
New Zealand Railways |
Mainline Cars Converted for Suburban Services |
November |
1969 |
|
New Zealand Railways |
Medium Powered Diesels (Db-class) |
November |
1965 |
|
New Zealand Railways |
Medium Powered Diesels (Di-class) |
January |
1967 |
|
New Zealand Railways |
Milson Deviation Opened |
January |
1965 |
|
New Zealand Railways |
Modern Marshalling Yard for Auckland |
September |
1959 |
|
New Zealand Railways |
Narrow Tunnel Clearances Restrict Rolling Stock |
March |
1966 |
|
New Zealand Railways |
New Approach to Long Distance Passenger Services |
June |
1970 |
|
New Zealand Railways |
New Bridges for Old on Manawatu Line |
September |
1958 |
|
New Zealand Railways |
New Christchurch Passenger Terminal |
July |
1961 |
|
New Zealand Railways |
New Corporate Emblem for All Operations |
May |
1970 |
|
New Zealand Railways |
New Design Features in Liner-train Coal Wagons |
December |
1969 |
|
New Zealand Railways |
New Electric Power to Meet Service Demands (Ew-Class) |
October |
1952 |
|
New Zealand Railways |
New Rail/Road Terminal (Timaru) |
December |
1964 |
|
New Zealand Railways |
New Shunters Replace Steam Power (Dsa & Dsb classes) |
December |
1967 |
|
New Zealand Railways |
New Terminal for Rail and Road Services |
February |
1968 |
|
New Zealand Railways |
New Zealand's First ""Underground"" Line |
July |
1965 |
|
New Zealand Railways |
New Zealand's Longest Tunnel will Speed North Island Freight |
December |
1974 |
|
New Zealand Railways |
No Tax Advantage over Competitors |
December |
1970 |
|
New Zealand Railways |
NZR Ballast Cleaning Machine is a First |
July |
1974 |
|
New Zealand Railways |
NZR Finances on Firmer Basis |
June |
1965 |
|
New Zealand Railways |
NZR Installing over 170 miles of CTC |
March |
1956 |
|
New Zealand Railways |
NZR's ""Hole Through a Hill"" (Rimutaka Tunnel) |
May |
1954 |
|
New Zealand Railways |
Planning to Meet Auckland's Future Passenger Transport Needs - Part 1 |
July |
1973 |
|
New Zealand Railways |
Planning to Meet Auckland's Future Passenger Transport Needs - Part 2 |
August |
1973 |
|
New Zealand Railways |
Preparing for Unit Freight Handling - Part 1 |
August |
1967 |
|
New Zealand Railways |
Preparing for Unit Freight Handling - Part 2 |
October |
1967 |
|
New Zealand Railways |
Rail Welding Extended: New Depots |
September |
1958 |
|
New Zealand Railways |
Rail-Air Freighting Gives Fast Turnaround |
May |
1953 |
|
New Zealand Railways |
Reasonable Result With Less Freight (1970/71 Report) |
November |
1972 |
|
New Zealand Railways |
Repeat Orders for Proven NZR Locomotives (Ja-Class) |
December |
1952 |
|
New Zealand Railways |
Route Setting Signal Control at Christchurch |
May |
1964 |
|
New Zealand Railways |
Royal Trains Readied |
February |
1954 |
|
New Zealand Railways |
Semi-Automated Hump Yard |
July |
1971 |
|
New Zealand Railways |
Silver Fern Diesel-Electric Railcars bring New Dimension to Rail Travel |
April |
1973 |
|
New Zealand Railways |
Silver Star Brings a New Image |
April |
1972 |
|
New Zealand Railways |
Sleek Railcars Bring Fast Transit (Articulated Units) |
October |
1955 |
|
New Zealand Railways |
Sliding Door Van for Palletised Traffic |
October |
1970 |
|
New Zealand Railways |
Sound Operated Signals |
August |
1963 |
|
New Zealand Railways |
Southerner - A Train of International Standards |
March |
1971 |
|
New Zealand Railways |
Southerner Brings a Brand New Image |
April |
1971 |
|
New Zealand Railways |
Special Features in Bulk Tallow Wagons |
November |
1965 |
|
New Zealand Railways |
Special Purpose Freight Vehicles (Bf and Ubs) |
December |
1967 |
|
New Zealand Railways |
Speeding up Signal Installations |
October |
1959 |
|
New Zealand Railways |
Steam Bows Out on North Island Main Trunk |
January |
1971 |
|
New Zealand Railways |
Steam's Brie Return to North Island |
August |
1969 |
|
New Zealand Railways |
Suburban Deviation Cuts Running Times |
September |
1962 |
|
New Zealand Railways |
Thermit Welding at Freight Yard (Te Rapa) |
October |
1969 |
|
New Zealand Railways |
Third Roll-on - Roll-off Ferry |
June |
1969 |
|
New Zealand Railways |
Towveyor System Speeds Freight Transhipment |
February |
1962 |
|
New Zealand Railways |
Triple Bogie Diesels (Dj-class) |
May |
1967 |
|
New Zealand Railways |
Triple Bogie Diesels (Dj-class) |
September |
1968 |
|
New Zealand Railways |
Uni-directional Freight Marshalling Yard |
September |
1964 |
|
New Zealand Railways |
Uni-directional Freight Yard (Te Rapa) |
May |
1966 |
|
New Zealand Railways |
Varied Jobs at Wellington for New N Z Diesels (De-class) |
September |
1952 |
|
New Zealand Railways |
What's Ahead for Inter-Island Freight Service |
October |
1966 |
|
Private Railways |
A Railway in a Hole - Part 1 (SEC Victoria) |
November |
1953 |
|
Private Railways |
A Railway in a Hole - Part 2 (SEC Victoria) |
December |
1953 |
|
Private Railways |
Australian-built Specialised Vehicles (AI&S) |
October |
1960 |
|
Private Railways |
BHP Buys Diesel Locos from Australian Builders |
January |
1955 |
|
Private Railways |
BHP Opens New Strip Mill at Port Kembla |
October |
1955 |
|
Private Railways |
Biggest Rail Projects Support Ore Developments |
February |
1971 |
|
Private Railways |
Canefield Diesel Re-built (Tully) |
February |
1964 |
|
Private Railways |
D.E. locos and 60-ton Cars Boost AI&S Operations |
November |
1951 |
|
Private Railways |
Development will Boost Ore Traffic: Notes on Four WA Lines |
August |
1973 |
|
Private Railways |
Diesel Loco Dips Lid for Low Bridge |
April |
1957 |
|
Private Railways |
Diesel Railcars for South Maitland Railways |
December |
1961 |
|
Private Railways |
Diesel-Hydraulic Locos for Difficult Emu Bay Line |
August |
1954 |
|
Private Railways |
Diesel-Hydraulic Shunters for Standard Gauge Steelworks Duties |
December |
1962 |
|
Private Railways |
Diesels Replace all Steam Power on Midland |
August |
1959 |
|
Private Railways |
Emu Bay Promotes Tourist Travel |
August |
1961 |
|
Private Railways |
Flange Welding Cuts Down-time (BHP) |
April |
1961 |
|
Private Railways |
Hamersley's Upgrading Program Boosts Ore Movements |
February |
1972 |
|
Private Railways |
Heavy Duty Rail Link for Hamersley Iron Venture |
January |
1967 |
|
Private Railways |
Heavy-duty Diesel Locomotive for Steelworks |
March |
1971 |
|
Private Railways |
Heavy-duty Sugar Mill Locos (Plane Creek) |
September |
1960 |
|
Private Railways |
Industrial Shunter - With a Difference (AI&S) |
October |
1960 |
|
Private Railways |
Large Orders for Canefield Diesels |
May |
1964 |
|
Private Railways |
Largest Australian-built Diesels for Iron Ore |
October |
1968 |
|
Private Railways |
Long Tunnel, Steep Grades Give Special Trouble (ACC) |
June |
1957 |
|
Private Railways |
Low-Weight wagons for Emu Bay Mineral Traffic |
July |
1970 |
|
Private Railways |
Manufacturers, Operators Consider Ore Problems |
July |
1971 |
|
Private Railways |
Midland Railway Road Freighters Open New Farmlands |
April |
1956 |
|
Private Railways |
Midland Railway's Busy Road Operations |
March |
1961 |
|
Private Railways |
Midland's New Medium Powered Diesels (G-Class) |
October |
1963 |
|
Private Railways |
Mid-Year Completion Date for Robe River Line |
March |
1972 |
|
Private Railways |
Mineral Developments Lift Emu Bay Freight Tonnage |
April |
1972 |
|
Private Railways |
Mobile Rail welding Plant (Mt. Newman) |
January |
1969 |
|
Private Railways |
Mt. Isa's Underground Rail Haulage System |
November |
1973 |
|
Private Railways |
New Diesel Locos for Lakewood, WA |
June |
1957 |
|
Private Railways |
New Diesel Shunter for Midland |
July |
1957 |
|
Private Railways |
New Mountain Type Locomotives for Silverton |
February |
1952 |
|
Private Railways |
Pilbara Hauls Rise |
July |
1974 |
|
Private Railways |
Powerful Diesel-Hydraulics for Emu Bay |
January |
1964 |
|
Private Railways |
Radio control of all Traffic movements (BHP) |
April |
1959 |
|
Private Railways |
Rail Transport's Vital Role in Steel Industry |
July |
1968 |
|
Private Railways |
Rail Weld Project for Underground Mine at Mt. Isa |
April |
1960 |
|
Private Railways |
Servicing Diesel Locos at Port Kembla Steelworks |
October |
1964 |
|
Private Railways |
Side Dump Wagons for Hot Slag (AIS) |
May |
1972 |
|
Private Railways |
Slim Gauge Mikados Make Merry at Whyalla (BHP) |
November |
1952 |
|
Private Railways |
Speno Demonstrates First Rail Grinding Train |
January |
1972 |
|
Private Railways |
Standard Gauge Line for Limestone Traffic |
July |
1967 |
|
Private Railways |
Sturdy Diesels of Snowy Mountains |
February |
1963 |
|
Private Railways |
Sugar is a Sweet Market for Railway Equipment |
October |
1954 |
|
Private Railways |
Sugar Mills Opt for Bogie Locos (Baldwin DH26B) |
October |
1974 |
|
Private Railways |
Taking Coal to Newcastle (South Maitland) Part 1 |
May |
1955 |
|
Private Railways |
Taking Coal to Newcastle (South Maitland) Part 2 |
June |
1955 |
|
Private Railways |
Touch of Class for Mt. Newman |
November |
1974 |
|
Private Railways |
Track-laying Records Broken (Mt. Newman) |
December |
1968 |
|
Private Railways |
Train Operations Commence on Mt. Newman Line |
April |
1969 |
|
Private Railways |
Tulloch-built Diesel for Coalcliff Colliery |
March |
1961 |
|
Private Railways |
Versatile Shunters for Two-Gauge Operations |
January |
1962 |
|
Private Railways |
Weipa - 19 km Rail Track for Bauxite Ore Haulage |
January |
1973 |
|
Private Railways |
Whyalla Steelworks Gauge Conversion |
September |
1963 |
|
Private Railways |
World's Largest Export Diesels (Hamersley) |
October |
1965 |
|
Queensland Railways |
""Pioneer"" Railways Hinder Queensland Development |
December |
1957 |
|
Queensland Railways |
$36 Million Rail Link for Export Coal (Goonyella) |
March |
1969 |
|
Queensland Railways |
$600,000 Freight Terminal (Moolabin) |
April |
1970 |
|
Queensland Railways |
£9m Electrification Project for Brisbane |
January |
1952 |
|
Queensland Railways |
925 h.p. Diesels for Outback Lines (1600-class) |
April |
1963 |
|
Queensland Railways |
Accent on Safety in All-steel Brakevans |
November |
1970 |
|
Queensland Railways |
All-Steel Cars for Brisbane Suburban Railways |
March |
1956 |
|
Queensland Railways |
Annual Report 1971-2: Year of Success and Despair |
April |
1973 |
|
Queensland Railways |
Annual Report 1972-3: Record Earnings and Freight Tonnage |
December |
1973 |
|
Queensland Railways |
Blueprint to Make the QR Pay |
September |
1962 |
|
Queensland Railways |
Boost for QR Bulks |
July |
1974 |
|
Queensland Railways |
Buffet Car for The Westlander |
May |
1970 |
|
Queensland Railways |
Capital Works Expansion |
August |
1965 |
|
Queensland Railways |
Collapsible Containers for Mt Isa Freight |
February |
1971 |
|
Queensland Railways |
Colour and Comfort Blend in New QR Train |
February |
1953 |
|
Queensland Railways |
Combined Power/Baggage Van |
January |
1968 |
|
Queensland Railways |
Consultants Briefed for Freight Rate Study |
December |
1969 |
|
Queensland Railways |
Cooling Fans Ensure Perfect Condition for Perishables |
April |
1959 |
|
Queensland Railways |
Developing Public Interest in Railway Activities |
July |
1959 |
|
Queensland Railways |
Development of Trailable Facing Points |
February |
1965 |
|
Queensland Railways |
Diesel-Electric Units for Qld Railways (1300-class) |
January |
1953 |
|
Queensland Railways |
Diesel-Hydraulic Cranes Have Wide Duty Range |
December |
1962 |
|
Queensland Railways |
Dual Purpose Wagon for Bulk Cement and Copper |
August |
1969 |
|
Queensland Railways |
Electrified Suburban Service (Brisbane Transport Plan) |
December |
1970 |
|
Queensland Railways |
Emergency Road Unit |
April |
1968 |
|
Queensland Railways |
Faith in General Service Diesels (1400-class) |
August |
1955 |
|
Queensland Railways |
First Contract for Mt. Isa Line Rehabilitation |
November |
1960 |
|
Queensland Railways |
First GN-class Nickel Ore Wagons for Greenvale Line |
December |
1973 |
|
Queensland Railways |
First Road/Rail Movement |
November |
1967 |
|
Queensland Railways |
First Section of Workshops Completed |
September |
1958 |
|
Queensland Railways |
Freight Vehicle Developments |
March |
1968 |
|
Queensland Railways |
Gladstone-Moura Line Opened |
April |
1968 |
|
Queensland Railways |
Gladstone-Moura Line reaches Half-way Mark |
November |
1966 |
|
Queensland Railways |
Goonyella Line Completed for Heaviest Trains |
July |
1971 |
|
Queensland Railways |
Greenvale Nickel Line Keeps on Schedule |
June |
1973 |
|
Queensland Railways |
How is Mt. Isa Rehabilitation Line Shaping Up? |
July |
1962 |
|
Queensland Railways |
Improved Signalling for Southside (Dutton Park) |
December |
1967 |
|
Queensland Railways |
Indooroopilly Bridge Construction |
October |
1958 |
|
Queensland Railways |
Lightweight Clyde Diesel Locomotives (1700-class) |
September |
1963 |
|
Queensland Railways |
Lightweight Diesels for Rugged Branchline Duties |
March |
1962 |
|
Queensland Railways |
Lightweight Units Augment Diesel Fleet (1500-class) |
June |
1956 |
|
Queensland Railways |
Massive Coal Trains Move over Heaviest Tracks |
December |
1971 |
|
Queensland Railways |
Massive Development Program in 1970 |
March |
1970 |
|
Queensland Railways |
Mid-year Completion Date for Goonyella Project |
January |
1971 |
|
Queensland Railways |
Modern Booking Hall for Brisbane Station |
August |
1960 |
|
Queensland Railways |
Modern Freight Rolling stock (CMIS, BLC, WH) |
October |
1956 |
|
Queensland Railways |
Modernised Power Vans for Air-Conditioned Trains |
September |
1972 |
|
Queensland Railways |
Modernised Suburban Stations |
July |
1973 |
|
Queensland Railways |
More Pull in New QR Diesels (1450-class) |
June |
1958 |
|
Queensland Railways |
New Bridge Eases Traffic Bottleneck (Calliope River) |
May |
1967 |
|
Queensland Railways |
New Duplication Speeds Trains (Yeerongpilly - Kuraby) |
December |
1953 |
|
Queensland Railways |
New Four-car Diesel Trains |
November |
1952 |
|
Queensland Railways |
New Gateway to Tropical Wonderland (Cairns) |
February |
1956 |
|
Queensland Railways |
New General Purpose Diesel Power (1250-class) |
April |
1960 |
|
Queensland Railways |
New High Level Burdekin River Bridge |
May |
1957 |
|
Queensland Railways |
New line Avoids Mt Morgan Rack Railway |
August |
1952 |
|
Queensland Railways |
New Locomotive Trends (Beyer-Garratts) |
January |
1952 |
|
Queensland Railways |
New Pacifics are Fast Runners (BB18¼-class) |
December |
1952 |
|
Queensland Railways |
New QR ""Glamour"" Station Completed at Rockhampton |
October |
1973 |
|
Queensland Railways |
New Sunlander Diesels for QR (1200-class) |
October |
1953 |
|
Queensland Railways |
New Trains and Tracks for Future |
July |
1952 |
|
Queensland Railways |
New Vans for High Speed Operations (GLC, CO) |
May |
1964 |
|
Queensland Railways |
One Hundred Years of Rail Progress |
August |
1965 |
|
Queensland Railways |
Planning Brisbane's Transport Needs |
January |
1971 |
|
Queensland Railways |
Potential Motive Power Dilemma |
August |
1965 |
|
Queensland Railways |
Power Signalling for Four-Track Section |
October |
1965 |
|
Queensland Railways |
Power Signalling for Mount Isa Line Junction |
November |
1965 |
|
Queensland Railways |
Prepares for Coal Traffic Build-up in 1971 |
April |
1971 |
|
Queensland Railways |
Profit Drop Caused by Higher Costs (1970/71 report) |
August |
1972 |
|
Queensland Railways |
Progress Report on Rehabilitation Program |
January |
1957 |
|
Queensland Railways |
Prototype Diesel-Hydraulic Shunting Loco |
May |
1968 |
|
Queensland Railways |
Prototype Railcars Delivered (Com-Eng SRC) |
June |
1956 |
|
Queensland Railways |
QR Builds Prototype Railcars |
August |
1956 |
|
Queensland Railways |
QR Increases Order for New HO Open Wagons |
February |
1974 |
|
Queensland Railways |
QR Lifts Tonnage to Record Level (1969/70) |
February |
1971 |
|
Queensland Railways |
QR Operations at Buoyant Level (1968/69 Report) |
December |
1969 |
|
Queensland Railways |
QR Speeds Wheat Hauls (WHX-class) |
January |
1961 |
|
Queensland Railways |
Railcars Boost Passenger Travel (2000-class) |
March |
1961 |
|
Queensland Railways |
Rolling Stock Designs Upgraded |
August |
1965 |
|
Queensland Railways |
Servicing Depot for Diesel Loco Fleet (Toowoomba) |
July |
1969 |
|
Queensland Railways |
Sizing Up Brisbane's Four-Track Project |
December |
1959 |
|
Queensland Railways |
Solid State Lighting Inverter |
December |
1967 |
|
Queensland Railways |
Special Care for Packaged Meat in CMIS Cars |
February |
1960 |
|
Queensland Railways |
Special Units Handle Heavy Loading (PWZ/PX-class) |
May |
1960 |
|
Queensland Railways |
Stainless Steel Suburban |
January |
1972 |
|
Queensland Railways |
Stainless Steel Trains for Suburban Services |
June |
1962 |
|
Queensland Railways |
Station Protection in Alerting System |
February |
1967 |
|
Queensland Railways |
Steam Locomotive Museum (Redbank) |
April |
1970 |
|
Queensland Railways |
Substantial Development Planned |
April |
1967 |
|
Queensland Railways |
Traffic Task is Complex and Continuous |
August |
1965 |
|
Queensland Railways |
Train Indicators Installed at Central Station |
November |
1969 |
|
Queensland Railways |
Trains Roll for Greenvale Nickel Bonanza |
October |
1974 |
|
Queensland Railways |
Transfer System Speeds Sugar Cane Traffic |
December |
1969 |
|
Queensland Railways |
Transition Coupler Evolved |
October |
1964 |
|
Queensland Railways |
Transportable Power Units for Containers |
October |
1971 |
|
Queensland Railways |
Two-way Radios Speed Coal Train Movements |
June |
1969 |
|
Queensland Railways |
Wanted: An Overall Plan for Brisbane's Transport |
January |
1964 |
|
Queensland Railways |
Weighing Coal Trains on the Move - Goonyella, etc. |
February |
1973 |
|
Queensland Railways |
Work Hastened on Brisbane Suburban Projects |
January |
1956 |
|
Queensland Railways |
Work Starts on Goonyella Line |
October |
1969 |
|
Queensland Railways |
Yard Improvements at Mt. Isa |
July |
1959 |
|
South Australian Railways |
""Blue Birds"" Woo More Traffic |
July |
1956 |
|
South Australian Railways |
""Missing Link"" in Our Standard Gauge Plans |
July |
1962 |
|
South Australian Railways |
A Case for an Adelaide Public Transport Authority (R.J. Fitch) |
January |
1973 |
|
South Australian Railways |
Added Comfort for Outstation Employees |
December |
1963 |
|
South Australian Railways |
Additional Machines Improve Production |
February |
1968 |
|
South Australian Railways |
Air-conditioned Cars for Port Pirie Service |
July |
1965 |
|
South Australian Railways |
An Answer to the Light Traffic Problem |
October |
1954 |
|
South Australian Railways |
An Appraisal of the Adelaide Standard Gauge Proposals |
September |
1970 |
|
South Australian Railways |
Annual Report 1971-2: Finances in Critical Position |
June |
1973 |
|
South Australian Railways |
Annual Report 1973-73: Revenue Falls, Results Deteriorate |
March |
1974 |
|
South Australian Railways |
Australia's First FlexiVan Services |
December |
1961 |
|
South Australian Railways |
Australia's Largest Narrow Gauge Steam Locos (400-class) |
September |
1953 |
|
South Australian Railways |
Automatic Features in New Tamper |
April |
1964 |
|
South Australian Railways |
Blueprint for a Revitalised South Australian Rail System - Part 1 |
August |
1973 |
|
South Australian Railways |
Blueprint for a Revitalised South Australian Rail System - Part 2 |
September |
1973 |
|
South Australian Railways |
Bread and Butter Traffic from Silver Mines |
March |
1954 |
|
South Australian Railways |
Broken Hill - Cockburn Bill |
December |
1968 |
|
South Australian Railways |
Bulk Cement Wagons for Two-gauge Operations |
October |
1967 |
|
South Australian Railways |
Cab to Van Radios Speed Train Movements |
May |
1963 |
|
South Australian Railways |
Centralised Traffic Control Eliminates Freight Delays |
March |
1973 |
|
South Australian Railways |
Christie Downs Urban Rail Extension Planned for Adelaide's Outer Residential Expansion |
November |
1973 |
|
South Australian Railways |
Commissioner Advocates Own Rate Fixing |
March |
1956 |
|
South Australian Railways |
Containerised Rock Fill for Murray Dam |
March |
1967 |
|
South Australian Railways |
Does South Australia Want Its Railways? |
April |
1972 |
|
South Australian Railways |
Dual Purpose Brake-vans (CGP-class) |
January |
1967 |
|
South Australian Railways |
End of Port Pirie's Gauge Tangle |
February |
1967 |
|
South Australian Railways |
Facts, Features and Figures on SAR D.E.s (900-class) |
November |
1951 |
|
South Australian Railways |
Freight Rise Lifts Revenue (1968/69 report) |
November |
1970 |
|
South Australian Railways |
Gauge Standardisation Progress |
May |
1968 |
|
South Australian Railways |
Greater Efficiency in New Rolling Stock (OMN) |
February |
1964 |
|
South Australian Railways |
History's Pages Turned Back in SAR's Centenary |
June |
1954 |
|
South Australian Railways |
How Goes S.A.'s South East Gauge Conversion? |
April |
1953 |
|
South Australian Railways |
Improved Brake Vans for Freight Service |
June |
1962 |
|
South Australian Railways |
Improved Design in New Suburban Railcars |
October |
1970 |
|
South Australian Railways |
Improved Layout in New Overland Sleeping Cars |
November |
1972 |
|
South Australian Railways |
Increasing Track Capacity |
December |
1968 |
|
South Australian Railways |
Industrial Expansion Integrated with Radium Hill Spur |
April |
1954 |
|
South Australian Railways |
Medium Powered Diesel Shunters (500-Class) |
March |
1965 |
|
South Australian Railways |
Mixed Gauge Rolling Stock in One Train |
October |
1974 |
|
South Australian Railways |
Modern Facilities for Maintaining D.E. Units |
July |
1953 |
|
South Australian Railways |
More About South Eastern Gauge Conversion |
February |
1954 |
|
South Australian Railways |
Murray Bridge Station Platform Reconstructed |
September |
1968 |
|
South Australian Railways |
Narrow Gauge Vehicles Altered for Standard Gauge |
September |
1967 |
|
South Australian Railways |
New Diesel Train Fleet Launched in Traffic Bid |
May |
1957 |
|
South Australian Railways |
New Locomotive Trends (Beyer-Garratts) |
January |
1952 |
|
South Australian Railways |
New Railcar Services are Speedy (Blue Birds) |
May |
1956 |
|
South Australian Railways |
New Rolling Stock Construction Program |
November |
1964 |
|
South Australian Railways |
On-board Refreshments for Bluebird Passengers |
August |
1972 |
|
South Australian Railways |
On-board Refreshments Updates The Overland |
January |
1972 |
|
South Australian Railways |
Overland Coach Cars (AJ-class) |
February |
1952 |
|
South Australian Railways |
Port Pirie's Street Station Closes |
September |
1967 |
|
South Australian Railways |
Prototype ""All-door"" Louvre Van - SL-class |
January |
1973 |
|
South Australian Railways |
Recommendations of Transport Investigation |
April |
1968 |
|
South Australian Railways |
Revenue Up Despite Competition (1970/71 report) |
March |
1972 |
|
South Australian Railways |
Roomette and Twinette Sleeping Cars |
May |
1952 |
|
South Australian Railways |
SAR Diesels Designed for Improved Operation (900-class) |
October |
1951 |
|
South Australian Railways |
SAR Income Shows Major Improvements (1969/70 report) |
September |
1971 |
|
South Australian Railways |
SAR Receives First Goodwin-built Diesels (930-class) |
March |
1956 |
|
South Australian Railways |
Speeding Freight Car Construction with New Equipment |
October |
1955 |
|
South Australian Railways |
Stainless Steel Brakevans (CD-class) |
November |
1965 |
|
South Australian Railways |
Standard Gauge Task Makes Good Progress |
February |
1967 |
|
South Australian Railways |
Standardisation Progress at Port Pirie |
November |
1967 |
|
South Australian Railways |
Standardised Passenger Car Designs |
January |
1964 |
|
South Australian Railways |
Stylish Diesels for Heavy Transfer Work (800-class) |
December |
1956 |
|
South Australian Railways |
Stylish Streamliners Sprint over SAR Tracks |
August |
1953 |
|
South Australian Railways |
Three-Gauge Transfer Facilities (Peterborough) |
January |
1968 |
|
South Australian Railways |
Truck Chassis Adapted for Inspection Cars |
September |
1966 |
|
South Australian Railways |
Vital Rail Link in Murray Floods |
October |
1956 |
|
South Australian Railways |
What is Involved in Broken Hill Line Standardisation? |
June |
1963 |
|
South Australian Railways |
What's the Future for These Narrow Gauge Branches |
May |
1970 |
|
South Australian Railways |
Work Commences on Industrial Branch |
September |
1965 |
|
Tasmanian Government Railways |
Annual Report 1971-2: Finances Show Slight Improvement |
March |
1973 |
|
Tasmanian Government Railways |
Annual Report 1972-73: New Traffic Brightens Freight Haul |
August |
1974 |
|
Tasmanian Government Railways |
Articulated Passenger Cars for Scenic Run |
April |
1956 |
|
Tasmanian Government Railways |
Bell Bay Line is Tough Construction Project |
July |
1972 |
|
Tasmanian Government Railways |
Bell Bay Railway Starts up Business |
August |
1974 |
|
Tasmanian Government Railways |
Deficit Reduced: Revenue UP (1968/69 report) |
September |
1970 |
|
Tasmanian Government Railways |
Diesels Get De-luxe Service in Tasmania |
June |
1953 |
|
Tasmanian Government Railways |
Excellent Progress on Bell Bay Project |
April |
1972 |
|
Tasmanian Government Railways |
Floods Ravage Main Line |
October |
1970 |
|
Tasmanian Government Railways |
Indian Designed Pacifics (M-class) |
June |
1952 |
|
Tasmanian Government Railways |
Mainline Diesels for Transfer Work (W-class) |
March |
1960 |
|
Tasmanian Government Railways |
Master Plan Required to Rehabilitate TGR Network |
June |
1974 |
|
Tasmanian Government Railways |
Mini-Mokers Converted for Inspection Duties |
October |
1967 |
|
Tasmanian Government Railways |
Motive Power Utilisation is Vital Problem |
January |
1965 |
|
Tasmanian Government Railways |
New Suburban Cars |
April |
1957 |
|
Tasmanian Government Railways |
New TGR Mountain Type Steam Locos (H-class) |
April |
1952 |
|
Tasmanian Government Railways |
One Hundred Years of Service |
February |
1971 |
|
Tasmanian Government Railways |
Operating Problems Plague TGR Financial Position |
June |
1966 |
|
Tasmanian Government Railways |
Production Challenge for TGR - FE Class Log Wagons |
March |
1973 |
|
Tasmanian Government Railways |
Railcars Handle Most of TGR Passenger Business |
December |
1953 |
|
Tasmanian Government Railways |
Recent TGR Fleet Additions |
July |
1959 |
|
Tasmanian Government Railways |
Revenue Fall Boosts Loss (1970/71 Report) |
October |
1972 |
|
Tasmanian Government Railways |
Servicing a Small Diesel Fleet |
February |
1965 |
|
Tasmanian Government Railways |
Specialised Vehicles for Sea Traffic |
January |
1960 |
|
Tasmanian Government Railways |
TGR Accepts Challenge! (Review) |
December |
1960 |
|
Tasmanian Government Railways |
TGR Container Wagons have Dual Type Coupling (FJ class) |
September |
1974 |
|
Tasmanian Government Railways |
TGR Seeks More Freight Business (1969/70 report) |
March |
1971 |
|
Tasmanian Government Railways |
TGR's New Higher Powered Diesels |
November |
1062 |
|
Tasmanian Government Railways |
Widened Tunnel Improves Traffic Potential |
April |
1965 |
|
Victorian Railways |
""New Look"" for Suburban Train Sets |
November |
1960 |
|
Victorian Railways |
£12m Standard Gauge Project (Albury-Melbourne) |
June |
1961 |
|
Victorian Railways |
100 Years of VR Progress |
February |
1959 |
|
Victorian Railways |
24-hour Assignment for D.E. Shunters (F-Class) |
March |
1952 |
|
Victorian Railways |
25 Years of service (Spirit of Progress) |
January |
1963 |
|
Victorian Railways |
A Cheaper Alternative for the Melbourne Underground |
October |
1969 |
|
Victorian Railways |
A New Concept in Lightweight Suburban Cars |
March |
1968 |
|
Victorian Railways |
After 2 Years: How Good is the Southern Aurora? |
April |
1964 |
|
Victorian Railways |
Aiding Gas and Oil Development |
February |
1969 |
|
Victorian Railways |
Air Rights over Rail Tracks Sold to Lift Revenue |
September |
1958 |
|
Victorian Railways |
Aluminium Wheat Hopper Wagons (GJX-class) |
April |
1966 |
|
Victorian Railways |
Ambulance Trolley for Freight Yard |
April |
1970 |
|
Victorian Railways |
An Underground to Untie Knots |
February |
1969 |
|
Victorian railways |
Annual Report 1971-2: Labour Costs Equal Revenue |
July |
1973 |
|
Victoroan Railways |
Annual Report 1972-73: Freight Earnings hit by Grain Loss |
May |
1974 |
|
Victorian Railways |
Australia's First FlexiVan Services |
December |
1961 |
|
Victorian Railways |
Auto Coupler Conversion Completed |
April |
1954 |
|
Victorian Railways |
Beauty and Brawn in New D.E. Power (B-Class) |
August |
1952 |
|
Victorian Railways |
Belgrave Extension Opened |
May |
1962 |
|
Victorian Railways |
Bendigo's New Station |
October |
1968 |
|
Victorian Railways |
Blueprint for Future VR Suburban Rail Expansion |
March |
1955 |
|
Victorian Railways |
Bushfire damage Quickly Replaced |
May |
1965 |
|
Victorian Railways |
Bust North East Line Relaid |
November |
1965 |
|
Victorian Railways |
Campaign to Lower Freight Damage Intensified |
April |
1958 |
|
Victorian Railways |
Cleaner Suburban Trains |
May |
1972 |
|
Victorian Railways |
Detailed Planning in Standard Gauge Publicity Campaign |
June |
1962 |
|
Victorian Railways |
Development Proceeding at Dynon Yard |
July |
1955 |
|
Victorian Railways |
Deviation saves Victorian Branch from Inundation |
October |
1956 |
|
Victorian Railways |
Dynon Diesel Maintenance Depot |
March |
1965 |
|
Victorian Railways |
Easing Geelong's Growing Pains |
January |
1958 |
|
Victorian Railways |
Easing Melbourne's Traffic Pains |
May |
1954 |
|
Victorian Railways |
Efficiency Rise Offset by Wages (1970/71 Report) |
September |
1972 |
|
Victorian Railways |
Electric Locos for VR's Big Coal Haul (L-Class) |
April |
1953 |
|
Victorian Railways |
Electronic Counters Check Ticket Printing |
March |
1962 |
|
Victorian Railways |
Eliminating Weak Operating Links Part 1 |
October |
1953 |
|
Victorian Railways |
Eliminating Weak Operating Links Part 2 |
November |
1953 |
|
Victorian Railways |
Excellent Support for Vintage Excursions |
March |
1966 |
|
Victorian Railways |
Fifty Years of Suburban Electrification |
July |
1969 |
|
Victorian Railways |
First Hudson Type Locomotives in Australia (R-class) |
February |
1952 |
|
Victorian Railways |
First Section of New Richmond Station Opened |
February |
1959 |
|
Victorian Railways |
Flood-ravaged Tracks Quickly Restored |
April |
1971 |
|
Victorian Railways |
Freight Yard Modernisation |
March |
1970 |
|
Victorian Railways |
Grade Separation is Vital Feature (Standard Gauge) |
August |
1961 |
|
Victorian Railways |
Greater Efficiency. New Rolling Stock (VHX, ALX) |
February |
1964 |
|
Victorian Railways |
Guidelines for Re-energising a Debilitated System |
June |
1972 |
|
Victorian Railways |
Health and Education Needs in Railway Service |
May |
1956 |
|
Victorian Railways |
Heidelberg Duplication |
May |
1952 |
|
Victorian Railways |
High Tensile Steel for Bulk Wheat Wagons (GJX-class) |
March |
1969 |
|
Victorian Railways |
Hostels Overcome Employee Housing Problems |
November |
1952 |
|
Victorian Railways |
How 2-Way Radio is Making out in Australia |
May |
1958 |
|
Victorian Railways |
How Much New Rolling Stock for Standard-Gauge Link |
March |
1958 |
|
Victorian Railways |
How the VR Approaches its Publicity Plan |
August |
1955 |
|
Victorian Railways |
Hydraulic Grain Discharger |
September |
1953 |
|
Victorian Railways |
Hydraulic Power for Specialised Duty on Small Diesel Shunter |
July |
1960 |
|
Victorian Railways |
Improved Cleaning Techniques for Traction Motors |
May |
1973 |
|
Victorian Railways |
Improved Services Bring Promise of Extra Business |
April |
1962 |
|
Victorian Railways |
Inspection Standards Improved with Nuclear Material |
June |
1959 |
|
Victorian Railways |
Last of the Wig Wags |
July |
1971 |
|
Victorian Railways |
Loco Utilisation and Running Shed Practices |
March |
1966 |
|
Victorian Railways |
Luxury Standard Gauge Trains Among World's Best |
April |
1962 |
|
Victorian Railways |
Making Room for New Standard Gauge Line |
September |
1961 |
|
Victorian Railways |
Many Rail Extensions in Metropolitan Transport Plan |
April |
1970 |
|
Victorian Railways |
Many Rail Projects in Metropolitan Transport Plan |
March |
1970 |
|
Victorian Railways |
Mechanisation Boosts Track Laying Output |
January |
1961 |
|
Victorian Railways |
Medium Powered Diesels for General Service (T-Class) |
October |
1955 |
|
Victorian Railways |
Melbourne - Albury Standard Gauge Line Construction |
April |
1962 |
|
Victorian Railways |
Melbourne Rail Works Planned to Outpace Suburban Growth |
December |
1957 |
|
Victorian Railways |
Melbourne Undeground Rail Loop Bill: Full Details |
January |
1971 |
|
Victorian Railways |
Melbourne Underground Loop: Construction Starts |
August |
1971 |
|
Victorian Railways |
Melbourne's Busy Rail Terminal |
March |
1969 |
|
Victorian Railways |
Mikados Find Favour in Two States (N-Class) |
October |
1953 |
|
Victorian Railways |
Millionth Over the Hump at Melbourne Freight Yard |
May |
1973 |
|
Victorian Railways |
Modern Facilities are Features of New VR Power (J-Class) |
July |
1954 |
|
Victorian Railways |
Modern Facilities for VR Suburban Line |
June |
1958 |
|
Victorian Railways |
Modern Interstate Terminal Facilities (Standard Gauge) |
July |
1961 |
|
Victorian Railways |
Modern Suburban Rolling Stock Ordered |
August |
1970 |
|
Victorian Railways |
Modern Trains for Commuter Traffic (Harris) |
July |
1956 |
|
Victorian Railways |
Modernisation Plan for Melbourne Freight Terminal |
May |
1968 |
|
Victorian Railways |
Modernisation Plans for Melbourne Goods Yard |
January |
1965 |
|
Victorian Railways |
More Coal Faster (Gippsland Electrification) |
December |
1951 |
|
Victorian Railways |
More Electric Power to Hasten Gippsland Trains |
May |
1953 |
|
Victorian Railways |
More Freight Handling Facilities for Melbourne |
November |
1957 |
|
Victorian Railways |
MURLA Takes Shape (Melbourne Underground) |
July |
1974 |
|
Victorian Railways |
Nation's First Mainline Electric Service (Gippsland) |
September |
1954 |
|
Victorian Railways |
Nation's No. 1 Rail Link Opened |
April |
1962 |
|
Victorian Railways |
New Approach in VR's Railcar Plan |
June |
1952 |
|
Victorian Railways |
New Electrical Equipment for Sub-stations |
February |
1955 |
|
Victorian Railways |
New Interstate Freight Terminal (South Dynon) |
September |
1959 |
|
Victorian Railways |
New Light Line Consolidations (J-Class) |
April |
1952 |
|
Victorian Railways |
New Moe-Yallourn Direct Line Opened |
January |
1954 |
|
Victorian Railways |
New Plant Beats Tranship Problems |
June |
1963 |
|
Victorian Railways |
New Power for Heavy Shunting Duties (W-Class) |
August |
1960 |
|
Victorian Railways |
New Station Improves Operations (St. Albans) |
June |
1960 |
|
Victorian Railways |
New Steel Box Vehicles for Interstate Runs (B/BB-class) |
October |
1958 |
|
Victorian Railways |
New Terminals Speed Standard Gauge Traffic |
April |
1962 |
|
Victorian Railways |
New Trains for Melbourne Suburban Services |
July |
1952 |
|
Victorian Railways |
New Yard Reduces Freight Times |
December |
1954 |
|
Victorian Railways |
On Tour with the Commissioners |
July |
1964 |
|
Victorian Railways |
On-board Refreshments Update The Overland |
January |
1972 |
|
Victorian Railways |
Outlook for 1970: VR Plans its Future |
August |
1960 |
|
Victorian Railways |
Pacific S-300 - An Appreciation |
November |
1954 |
|
Victorian Railways |
Poison Train Speeds Track Maintenance |
February |
1956 |
|
Victorian Railways |
Press Advertising Boosts Rail Traffic |
February |
1967 |
|
Victorian Railways |
Projector Unit in Destination Indicator |
February |
1966 |
|
Victorian Railways |
Pulpwood Freight Speeded Up |
May |
1958 |
|
Victorian Railways |
Pulverised Brown Coal Eases Fuel Shortage |
October |
1951 |
|
Victorian Railways |
Pulverised Fuel Tests Abandoned |
April |
1957 |
|
Victorian Railways |
Rail Industry's View of Section 92 |
June |
1966 |
|
Victorian Railways |
Railfan. Administration Co-operation (Puffing Billy) Part 1 |
September |
1964 |
|
Victorian Railways |
Railfan. Administration Co-operation (Puffing Billy) Part 2 |
October |
1964 |
|
Victorian Railways |
Rail's Task in Solving Urban Traffic Problems |
November |
1964 |
|
Victorian Railways |
Railways are Vital Factor in urban Planning |
May |
1966 |
|
Victorian Railways |
Railways' Part in Solving City Traffic Problems |
May |
1964 |
|
Victorian Railways |
Recompense for Social Services (1968/69 report) |
May |
1970 |
|
Victorian Railways |
Renewed Interest in Trams - New Cars for Melbourne Part 1 |
June |
1973 |
|
Victorian Railways |
Renewed Interest in Trams - New Cars for Melbourne Part 2 |
August |
1973 |
|
Victorian Railways |
Route Setting Controls for Three Track Signalling |
August |
1966 |
|
Victorian Railways |
Royal Trains Readied |
February |
1954 |
|
Victorian Railways |
School Clubs Encourage Rail Interest |
October |
1962 |
|
Victorian Railways |
Servicing the VR Diesel Fleet |
April |
1966 |
|
Victorian Railways |
Sophisticated Computer Equipment |
August |
1968 |
|
Victorian Railways |
Sophisticated Signalling System for Undergrond |
October |
1972 |
|
Victorian Railways |
Southern Aurora Anniversary Exhibition |
May |
1972 |
|
Victorian Railways |
Spencer Street Station Building |
June |
1964 |
|
Victorian Railways |
Stainless Steel Suburban Trains to Replace Obsolete Equipment |
June |
1973 |
|
Victorian Railways |
Standard Gauge Freight Services Inaugurated |
February |
1962 |
|
Victorian Railways |
Steam Power can Still Make Money for Rail administrations |
July |
1973 |
|
Victorian Railways |
Suburban Car Bogies for Y-class Diesels |
September |
1964 |
|
Victorian Railways |
Suburban Extension will use Freeway Median |
February |
1972 |
|
Victorian Railways |
Suburban Grade Separation Project |
May |
1968 |
|
Victorian Railways |
Successful Container Trials |
July |
1958 |
|
Victorian Railways |
The First ""Million-Miler"" Diesel Electric |
February |
1958 |
|
Victorian Railways |
The Importance of the Diesel Shop |
July |
1954 |
|
Victorian Railways |
Time is Running Out for ""Small Gauge"" Lines - Part 1 |
March |
1955 |
|
Victorian Railways |
Time is Running Out for ""Small Gauge"" Lines - Part 2 |
April |
1955 |
|
Victorian Railways |
Two-way Running Overcomes Track Bottleneck (Geelong) |
April |
1960 |
|
Victorian Railways |
Unique Pipe Installations |
July |
1969 |
|
Victorian Railways |
Urgent Need to Recast VR Finances (1969/70 report) |
May |
1971 |
|
Victorian Railways |
VR Builds Two-level Car Carrying Wagons (AA-class) |
November |
1960 |
|
Victorian Railways |
VR Buys Industrial Loco (ex ACC D1) |
August |
1969 |
|
Victorian Railways |
VR Celebrates its First 100 Years |
October |
1954 |
|
Victorian Railways |
VR Installs CTC on Glen Waverley Line |
January |
1959 |
|
Victorian Railways |
VR Uses American Methods in Testing Diesel Parts |
July |
1957 |
|
Victorian Railways |
VR's First 1½ Million Miler |
September |
1962 |
|
Victorian Railways |
VR's New Interstate Passenger Terminal |
January |
1961 |
|
Victorian Railways |
VR's Panoramic Daytime Cars |
October |
1957 |
|
West. Aust. Government Railways |
641 km Converted Lines added to WAGR |
June |
1974 |
|
West. Aust. Government Railways |
Administrative Terminal Structure for East Perth |
February |
1974 |
|
West. Aust. Government Railways |
Annual Report 1971-2: Rising Costs Cause Big Net Loss |
February |
1973 |
|
West. Aust. Government Railways |
Annual Report 1972-73: Good Performance Offsets Loss |
March |
1974 |
|
West. Aust. Government Railways |
Australia's First Vendomat Trains |
August |
1964 |
|
West. Aust. Government Railways |
Australia's Heaviest Narrow Gauge Freight Trains |
November |
1969 |
|
West. Aust. Government Railways |
Australia's Largest Standard Gauge Project |
November |
1961 |
|
West. Aust. Government Railways |
Australia's Most Powerful Diesels (L-class) |
March |
1968 |
|
West. Aust. Government Railways |
Automated Hump Yard for Narrow Gauge Freight |
March |
1972 |
|
West. Aust. Government Railways |
Automatic Signalling for Eastern Gldsfields Standard Gauge Line |
January |
1973 |
|
West. Aust. Government Railways |
Automatic Signalling Installed on Suburban Line |
November |
1964 |
|
West. Aust. Government Railways |
Automatic Signals Increase Track Capacity |
April |
1963 |
|
West. Aust. Government Railways |
Avon Valley Line Opened |
June |
1966 |
|
West. Aust. Government Railways |
Brake Cylinder Hoist to Ease Wagon Repair Work |
August |
1959 |
|
West. Aust. Government Railways |
Bulk Cement Wagon with Pressure Discharge (XR-class) |
May |
1969 |
|
West. Aust. Government Railways |
Concrete Bed for Swan View Tunnel |
December |
1956 |
|
West. Aust. Government Railways |
Containers for Specialised Operations |
August |
1966 |
|
West. Aust. Government Railways |
Containers for Two-gauge Iron Ore Traffic |
December |
1970 |
|
West. Aust. Government Railways |
Converted Steam Loco is Useful Unit (UT-class) |
January |
1958 |
|
West. Aust. Government Railways |
CTC for Northam-Koolyanobbing Standard Gauge Line |
September |
1969 |
|
West. Aust. Government Railways |
CTC Increases Line Capacity |
December |
1955 |
|
West. Aust. Government Railways |
CTC Installation for South-Western Line |
April |
1952 |
|
West. Aust. Government Railways |
CTC on standard Gauge Line (Midland-Freemantle-Kwinana) |
February |
1969 |
|
West. Aust. Government Railways |
Cummins-powered Lightweight Shunters (T-class) |
June |
1968 |
|
West. Aust. Government Railways |
D.E. Trains and Railcars Give Fast Service |
November |
1953 |
|
West. Aust. Government Railways |
Design Limits Overcome on WA Diesels (X-class) |
August |
1954 |
|
West. Aust. Government Railways |
Diesel Depot Speeds Suburban Railcar Turnround |
December |
1962 |
|
West. Aust. Government Railways |
Doing Things Right by the Diesels |
July |
1955 |
|
West. Aust. Government Railways |
Driving Railcar Trailers |
May |
1962 |
|
West. Aust. Government Railways |
Dual Gauge Detection built into WAGR Yard Signalling |
September |
1974 |
|
West. Aust. Government Railways |
Dual-Gauge Locomotive Maintenance Depot (Forrestfield) |
October |
1969 |
|
West. Aust. Government Railways |
Dual-Service Locos Combine Power and Lightweight |
July |
1952 |
|
West. Aust. Government Railways |
Effective Design in New Buildings |
November |
1966 |
|
West. Aust. Government Railways |
Electronic Weighbridges |
August |
1972 |
|
West. Aust. Government Railways |
Electronic Wizardry Provides Fast Statistics |
April |
1956 |
|
West. Aust. Government Railways |
Equipment for Corrosive Cargoes |
October |
1972 |
|
West. Aust. Government Railways |
Esperance Line Rehabilitation |
September |
1970 |
|
West. Aust. Government Railways |
Export Iron Ore Traffic (Koolanooka) |
June |
1967 |
|
West. Aust. Government Railways |
Face Lift for the Australind |
December |
1960 |
|
West. Aust. Government Railways |
Faster Ballast Loading |
October |
1965 |
|
West. Aust. Government Railways |
Financial Position Reviewed |
March |
1964 |
|
West. Aust. Government Railways |
Floodlights at Leighton Freight Terminal |
September |
1967 |
|
West. Aust. Government Railways |
Former Steam Railcar in a New Role |
January |
1961 |
|
West. Aust. Government Railways |
Further Rise of Freight Traffic (1970/71 Report) |
June |
1972 |
|
West. Aust. Government Railways |
Gauge Standardisation Progress Report |
June |
1965 |
|
West. Aust. Government Railways |
Gauge Switch adds Bogie Casting to WAGR Workshops Expertise |
December |
1974 |
|
West. Aust. Government Railways |
Giant Wheat Hopper Wagons (WWA-class) |
April |
1969 |
|
West. Aust. Government Railways |
Good Progress on Lefroy Standard Gauge Line |
April |
1973 |
|
West. Aust. Government Railways |
Governments Agree on Standard Gauge Costs |
August |
1967 |
|
West. Aust. Government Railways |
Greater Efficiency in New Rolling Stock (QU) |
February |
1964 |
|
West. Aust. Government Railways |
Greater Operating Efficiency Brings Lower Deficit |
May |
1963 |
|
West. Aust. Government Railways |
Hamersley offers its Tracks for Rail Equipment Evaluations (WAGR Seminar) |
November |
1974 |
|
West. Aust. Government Railways |
Heavy Duty Diesels for Standard Gauge (K-class) |
March |
1966 |
|
West. Aust. Government Railways |
Heavy Duty Narrow Gauge Diesels (AB and RA classes) |
March |
1970 |
|
West. Aust. Government Railways |
Heavy Steam Power for WA (V-class) |
August |
1955 |
|
West. Aust. Government Railways |
High Capacity Bauxite Wagons |
October |
1968 |
|
West. Aust. Government Railways |
High Capacity Wagons for Alumina Traffic |
December |
1972 |
|
West. Aust. Government Railways |
High Capacity Wagons for WA Alumina Traffic - XF-class |
January |
1973 |
|
West. Aust. Government Railways |
High Capacity, Low Tare Bulk Grain Hoppers - XW-class |
March |
1973 |
|
West. Aust. Government Railways |
Higher Productivity at Wagon Repair Depot |
June |
1971 |
|
West. Aust. Government Railways |
Historic Electric Locomotive for Display |
November |
1970 |
|
West. Aust. Government Railways |
Improved Design for Flat Wagons (WF-class) |
January |
1967 |
|
West. Aust. Government Railways |
Improved Refrigerator Special Use Cars (WA/VD-class) |
November |
1959 |
|
West. Aust. Government Railways |
Iron Ore Movements over Standard Gauge |
August |
1967 |
|
West. Aust. Government Railways |
Jarrahdale-Kwinana Bauxite Line Opened |
October |
1963 |
|
West. Aust. Government Railways |
Journey's End for Midland Railway Company |
November |
1967 |
|
West. Aust. Government Railways |
Kewdale Freight Terminal |
October |
1968 |
|
West. Aust. Government Railways |
Kewdale Terminal is Ready for Freight Traffic |
December |
1969 |
|
West. Aust. Government Railways |
Large Modern Hump-retarder Yard and New Goods Terminal |
December |
1958 |
|
West. Aust. Government Railways |
Latest Freight Techniques Displayed |
July |
1963 |
|
West. Aust. Government Railways |
Lightweight Bogies for Stainless Steel Railcars |
December |
1966 |
|
West. Aust. Government Railways |
Lightweight D.E. Shunters (Y-Class) |
February |
1954 |
|
West. Aust. Government Railways |
Locally Built Shunters for WAGR |
October |
1962 |
|
West. Aust. Government Railways |
Low Weight Transfer Bogies (R-class) |
April |
1968 |
|
West. Aust. Government Railways |
Luxury Buffet-Lounge Cars for Kalgoolie Express |
August |
1963 |
|
West. Aust. Government Railways |
Luxury Coach for Road Services |
July |
1968 |
|
West. Aust. Government Railways |
Luxury Travel in New Rail and Coach Services |
November |
1961 |
|
West. Aust. Government Railways |
Many Rail Improvements in Transport Report |
September |
1966 |
|
West. Aust. Government Railways |
Massive Bulk Cement Tank Car |
September |
1970 |
|
West. Aust. Government Railways |
Massive Public Welcome for The Prospector |
February |
1972 |
|
West. Aust. Government Railways |
Midland Takeover Reviewed |
October |
1964 |
|
West. Aust. Government Railways |
Mini-Mokers for Rail/Road Operations |
May |
1970 |
|
West. Aust. Government Railways |
More Diesel Motive Power, WAGR (A & C classes) |
June |
1963 |
|
West. Aust. Government Railways |
More Efficiency from New Ticket System |
June |
1955 |
|
West. Aust. Government Railways |
More Efficient Freight Handling |
August |
1971 |
|
West. Aust. Government Railways |
More Road Competition for WA Railways |
October |
1969 |
|
West. Aust. Government Railways |
Moving Bulk Commodities by Rail |
June |
1970 |
|
West. Aust. Government Railways |
Narrow Gauge Service Continues as Track is Standardised |
November |
1973 |
|
West. Aust. Government Railways |
New Collie Bridge Extends Range of Heavy Power |
October |
1957 |
|
West. Aust. Government Railways |
New Collie Freight Yards Planned for Future |
April |
1955 |
|
West. Aust. Government Railways |
New CTC Plant Improves Track Capacity |
August |
1959 |
|
West. Aust. Government Railways |
New Freight Loco. Designs for WAGR |
November |
1952 |
|
West. Aust. Government Railways |
New Interchange Facility for Seaport Traffic |
January |
1962 |
|
West. Aust. Government Railways |
New Line Assists Industrial Development |
July |
1962 |
|
West. Aust. Government Railways |
New Railcars ""Shot in the Arm"" to Suburban Runs |
March |
1955 |
|
West. Aust. Government Railways |
New Railcars for Perth Commuters |
February |
1954 |
|
West. Aust. Government Railways |
New Railcars to Woo Perth Commuters |
April |
1960 |
|
West. Aust. Government Railways |
New Station Buildings for Busy Rail Centres |
December |
1969 |
|
West. Aust. Government Railways |
New Terminal Building for Perth |
April |
1971 |
|
West. Aust. Government Railways |
New Terminal Speeds Freight Tranship |
March |
1962 |
|
West. Aust. Government Railways |
New Trailer Cars for Suburban Traffic |
August |
1956 |
|
West. Aust. Government Railways |
New Train for Midland Line (The Midlander) |
January |
1965 |
|
West. Aust. Government Railways |
Nickel Developments Bring New Traffic |
June |
1968 |
|
West. Aust. Government Railways |
Open Wagons Converted for Superphosphate Traffic |
March |
1970 |
|
West. Aust. Government Railways |
Passenger Appeal in Modernised Railcars |
July |
1967 |
|
West. Aust. Government Railways |
Power Signalling for Midland Rail/Bus Terminal |
July |
1969 |
|
West. Aust. Government Railways |
Pressure Ventilation in S.G. Diesels (H-class) |
June |
1965 |
|
West. Aust. Government Railways |
Problems in Future WAGR Plans and Traffic Trends |
January |
1954 |
|
West. Aust. Government Railways |
Progress Report on Standard Gauge Project |
January |
1964 |
|
West. Aust. Government Railways |
Prototype Freight Cars Now in Service |
April |
1952 |
|
West. Aust. Government Railways |
Radio-Telephones Improve Ore Operations |
January |
1968 |
|
West. Aust. Government Railways |
Rail/Road Refrigerated Containers |
August |
1959 |
|
West. Aust. Government Railways |
Railway-Operated Road Services |
March |
1954 |
|
West. Aust. Government Railways |
Reinforced Fibreglass Reefer Vans |
May |
1968 |
|
West. Aust. Government Railways |
Relay Interlocking for Busy Dual Gauge Yard |
February |
1968 |
|
West. Aust. Government Railways |
Robb Jetty Freight Terminal |
July |
1972 |
|
West. Aust. Government Railways |
Service Improvements Boost Freight Business |
July |
1964 |
|
West. Aust. Government Railways |
Signalling Updated at Busy Station |
October |
1970 |
|
West. Aust. Government Railways |
Special Progress Report on Standard Gauge Project |
February |
1966 |
|
West. Aust. Government Railways |
Specialised Equipment Pevents Engine Failures: Water Pollution |
March |
1973 |
|
West. Aust. Government Railways |
Specialised Tank Cars for Nickel Concentrate |
July |
1970 |
|
West. Aust. Government Railways |
Specialised Vehicles for Cars, Timber (QMD, QMC, QBB) |
May |
1964 |
|
West. Aust. Government Railways |
Stacey Lamb Train Sets New Record |
March |
1972 |
|
West. Aust. Government Railways |
Standard Gauge Passenger Service Extended to Perth |
August |
1969 |
|
West. Aust. Government Railways |
Standard Gauge Progress in Metropolitan Area |
November |
1968 |
|
West. Aust. Government Railways |
Standard Gauge Project ""On Schedule"" |
December |
1966 |
|
West. Aust. Government Railways |
Standard Gauge Project Makes Progress |
December |
1964 |
|
West. Aust. Government Railways |
Standard Gauge Project Planning |
January |
1963 |
|
West. Aust. Government Railways |
Standard Gauge Rolling Stock |
September |
1965 |
|
West. Aust. Government Railways |
Standard Underframes for New Freight Cars |
July |
1953 |
|
West. Aust. Government Railways |
Suburban Line Resignalling (East Perth-Rivervale) |
May |
1969 |
|
West. Aust. Government Railways |
Suburban Re-Railing Ends South-west Rehabilitation |
February |
1962 |
|
West. Aust. Government Railways |
Suburban Station Resignalled |
June |
1971 |
|
West. Aust. Government Railways |
Successful Tests with WA Briquette Coal |
February |
1958 |
|
West. Aust. Government Railways |
The Indian Pacific in Western Australia |
April |
1970 |
|
West. Aust. Government Railways |
Track Machines Demonstrated |
February |
1970 |
|
West. Aust. Government Railways |
Two-gauge Locomotive Depot |
September |
1968 |
|
West. Aust. Government Railways |
Unit Trains for Salt Traffic |
November |
1970 |
|
West. Aust. Government Railways |
User Choice of Transport in WA |
November |
1969 |
|
West. Aust. Government Railways |
Vintage Train is Tourist Attraction |
June |
1970 |
|
West. Aust. Government Railways |
WA Standard Gauge Construction Details |
May |
1962 |
|
West. Aust. Government Railways |
WAGR Completes Two Private-Owner Tank Cars - WJL-class |
November |
1973 |
|
West. Aust. Government Railways |
WAGR Seeks Overseas Freights to Eastern States |
December |
1963 |
|
West. Aust. Government Railways |
WAGR's Massive Standard Gauge Project Completed - Forrestville Complex |
October |
1973 |
|
West. Aust. Government Railways |
What is Improved in Kalgoorlie-Kwinana Standardisation |
February |
1961 |
|
West. Aust. Government Railways |
Wheat Haul Increases Loss (1968/69 report) |
October |
1970 |
|
West. Aust. Government Railways |
Wheat, Ore Traffic Lift Revenue (1969/70 report) |
October |
1971 |
|
West. Aust. Government Railways |
World's Finest Railcars for Kalgoorlie Service |
September |
1971 |
|
General |
$210 Million Gauge Standardisation Project Completed |
January |
1970 |
|
General |
£41m Standard Gauge Plan to Link Capital Cities |
January |
1957 |
|
General |
1970: The Year of Big Power (Diesel Review) |
November |
1970 |
|
General |
200km/h Passenger Trains is 1976 aim of British Rail |
July |
1974 |
|
General |
29 Papers Presented at rail Sleeper Conference. Guide and Extracts |
September |
1973 |
|
General |
A Sydney-Melbourne High Speed Rail Link |
July |
1966 |
|
General |
Advertising Spreads the Railways' Sales Story |
September |
1960 |
|
General |
Aerotrains for Australia? |
May |
1972 |
|
General |
Air Discharge Speeds Bulk Vehicle Turn-Round |
January |
1962 |
|
General |
Are Diesel Loco Economy Claims ""Unfounded""? |
July |
1961 |
|
General |
Are Mobilvans Better than Piggy-Back? |
November |
1955 |
|
General |
Are Railways Meeting ""Over the Border"" Indifference? |
May |
1958 |
|
General |
Are the Railways Still Paying Interest on Non-existent Assets? (1970 Industry Review) |
August |
1970 |
|
General |
Are We Winning Back the Interstate Passenger? |
August |
1962 |
|
General |
Australia Needs an ASTRO Program NOW |
April |
1971 |
|
General |
Australian and New Zealand Diesel Motive Power Tabulation |
November |
1974 |
|
General |
Australian Rail Industry Reviewed |
June |
1964 |
|
General |
Australian Railcars Make Spectacular Delivery Run (India) |
March |
1959 |
|
General |
Australian Standard Container Specification |
March |
1968 |
|
General |
Australia's rail Expansion |
July |
1965 |
|
General |
Automatic Freight Operations. British Railway's Autowagon |
November |
1973 |
|
General |
Blueprint for an Interstate Railway Commission |
April |
1961 |
|
General |
British Rail Doubles Train Speed in Test Simulation of Future Operations |
December |
1973 |
|
General |
British Railways Develops Tomorrow's ""Advanced Passenger Train"" |
February |
1973 |
|
General |
Cab or Hood Units? (Diesel Review) |
April |
1965 |
|
General |
Can Australia Use these Narrow Gauge D/e Tonnage Haulers? |
October |
1973 |
|
General |
Can Standard Gauge Replace Shipping Lanes? |
March |
1967 |
|
General |
Changes in Road-Rail Policy Recommended |
December |
1961 |
|
General |
Comeng Unveils Low Cost Radid Transit Scheme |
June |
1972 |
|
General |
Commissioners' Overseas Tour |
July |
1966 |
|
General |
Comprehensive Costing Can be Vital Management Aid |
July |
1970 |
|
General |
Computer's Role in Railway Management |
October |
1968 |
|
General |
Container Loading Methods |
February |
1968 |
|
General |
Containerisation and the Australian Railways |
October |
1966 |
|
General |
Development of the ANZR Research Organisation |
March |
1963 |
|
General |
Diesel Giants on the March (Diesel Review) |
April |
1966 |
|
General |
Diesel Locos for Snowy Mountains Project |
May |
1959 |
|
General |
Diesel Motive Developments in 1967 |
November |
1967 |
|
General |
Diesel Motive Power Reviewed in Depth |
November |
1966 |
|
General |
Diesel Motive Power Trends |
November |
1968 |
|
General |
Diesel Power for Traffic Developments (Annual Review) |
November |
1969 |
|
General |
Dome Cars are Possible in Australia on all gauges |
January |
1959 |
|
General |
Economic problems Facing Australian Railways To-day - Part 1 |
June |
1960 |
|
General |
Economic problems Facing Australian Railways To-day - Part 2 |
July |
1960 |
|
General |
Executives Report on Container Traffic Possibilities |
September |
1967 |
|
General |
Facts and Figures on Broken Hill-Port Pirie Gauge Conversion Scheme |
November |
1957 |
|
General |
Fingerprints Reveal Diesel Engine Defects |
January |
1956 |
|
General |
Fix Container Sizes NOW before designs run amok |
November |
1958 |
|
General |
Flexibility is Foremost at Rudders' Terminal |
May |
1966 |
|
General |
Floods Ravage Vast Mileages in Eastern States |
March |
1974 |
|
General |
Fork Lift Trucks (Feature and Specifications) |
November |
1965 |
|
General |
Fork Lift Trucks (Feature and Specifications) |
October |
1966 |
|
General |
Fuel and Lubricant Practices |
December |
1965 |
|
General |
Full Details of Sydney-Perth Through Services |
June |
1964 |
|
General |
Further Development in Diesel Loco Transmissions |
October |
1955 |
|
General |
Future Assured for D.C. Traction Motors |
April |
1967 |
|
General |
Gas Turbine Trains in Australia? |
May |
1967 |
|
General |
Gauge Unification - Australia's Biggest Headache |
February |
1959 |
|
General |
Go See Australia - The Challenge to Railways |
October |
1971 |
|
General |
Government Committee Probes North Transport Problems |
September |
1967 |
|
General |
Heavy Duty Railways Hustle Nation's Export Minerals |
March |
1974 |
|
General |
How Big, How Busy? (Rail Industry Review) |
June |
1965 |
|
General |
How Far ... How Fast ... by Metric? |
August |
1972 |
|
General |
How Strong is the Case for Commonwealth Ownership? |
May |
1973 |
|
General |
How Will Decimal Currency Affect Rail Operations? |
July |
1963 |
|
General |
Improvements Needed to Meet Defence Requirements |
May |
1967 |
|
General |
Inadequate Loan Allocations Inhibiting Development |
June |
1971 |
|
General |
Increased Payloads with Low Alloy Steel |
November |
1968 |
|
General |
Inflammable Dunnage Bags All Claims Prevention |
June |
1959 |
|
General |
Introducing a New Concept in Transcontinental Travel |
February |
1970 |
|
General |
Is There a Case for an Interstate Railway Commission? |
November |
1960 |
|
General |
Is There a Compromise Between Bogie and 4-Wheel Stock? |
June |
1962 |
|
General |
Is There an Answer to the Rail Corrugation Problem? |
June |
1960 |
|
General |
Is There an Answer to the Rail Passenger Crisis in Australia? |
September |
1973 |
|
General |
Keeping Abreast of world Development (Annual Diesel Motive Power Review) |
November |
1971 |
|
General |
Loading Containers on Flatcars aided by Portable Platform |
February |
1974 |
|
General |
Loco Teaser: ...to Buy New....or Rebuild? Annual Motive Power Review |
November |
1974 |
|
General |
London - Glasgow Electrification: A Triumph - More Wires Forecast |
December |
1974 |
|
General |
Long Life for Railway Sleepers |
October |
1955 |
|
General |
Luxurious Equipment for East/West Service |
February |
1970 |
|
General |
Luxury Equipment for Sydney-Perth Service |
October |
1966 |
|
General |
Management Training in the Rail Industry |
April |
1970 |
|
General |
Metric Conversion: A Major Task for Railways |
September |
1971 |
|
General |
Missing Link in Rail Public Relations |
March |
1963 |
|
General |
Modern Chemicals Reduce Weed Control Problems |
July |
1962 |
|
General |
Modern Rolling Stock for Standard Gauge Operations |
January |
1970 |
|
General |
Modern Signalling Trends |
November |
1966 |
|
General |
More Research Needed to Improve Bogie Design (ASME) |
September |
1958 |
|
General |
Motive Power for Mineral Haulage |
December |
1972 |
|
General |
Need to Start Australian Gauge Standardisation |
October |
1955 |
|
General |
New Coal Handling Equipment Improves Hopper Turnround |
May |
1959 |
|
General |
New Deliveries from Goninan mark 75th year (NSWPTC NRY-class & AIS 89-tonne Hoppers) |
April |
1974 |
|
General |
New Freight Terminal for Cargo-Rudders |
January |
1964 |
|
General |
New Railways are Essential to Boost Our Beef Industry |
July |
1953 |
|
General |
Our Railways in the Seventies (by R.J. Pascoe) |
August |
1972 |
|
General |
Outsize special Purpose Containers for TNT GM-H Contract) |
April |
1974 |
|
General |
Participation in the Freight Forwarding Movement |
October |
1970 |
|
General |
Prepare Now for Decimal Currency |
December |
1964 |
|
General |
Prolonging Sleeper Life |
February |
1967 |
|
General |
Putting Electronics on Your Pay-Roll (car identification) |
November |
1959 |
|
General |
Rail Fares and Freight Rates in the Next Decade |
July |
1968 |
|
General |
Rail Freight Operations in Australia |
December |
1974 |
|
General |
Rail Industry Developments for 1964/65 |
June |
1966 |
|
General |
Rail Industry Developments in 1965/66 |
June |
1967 |
|
General |
Rail Operations Must be Made Viable |
February |
1971 |
|
General |
Rail Transport Aids Northern Cattle Development |
June |
1967 |
|
General |
Rail Transport in the Next Decade |
April |
1968 |
|
General |
Railways ARE Meeting Interstate Freight Problems |
July |
1958 |
|
General |
Railways Face the Challenge of Containerisation |
January |
1969 |
|
General |
Railways in the Next Decade (by W.T. Webb) |
March |
1970 |
|
General |
Railways Must Seek Greater Share of Grants |
January |
1971 |
|
General |
Railways Role as Transport Specialists |
March |
1962 |
|
General |
Ready for Decimal Currency Changeover |
January |
1966 |
|
General |
Recommendations from ECAFE Conference |
August |
1962 |
|
General |
Red Carpet Service for Intersystem Freight Traffic |
January |
1970 |
|
General |
Repair or Replace Ageing Diesel Motive Power |
August |
1962 |
|
General |
Should Common Carrier Obligations be Removed? |
January |
1967 |
|
General |
Should Long Distance Trains be Nationalised? |
May |
1971 |
|
General |
Simplified Rail-road Transfer |
September |
1968 |
|
General |
Skeletal Flatwagon evolved from Co-operative Design Effort |
May |
1974 |
|
General |
Smaller Orders Reflect Economic Conditions (Annual Motive Power Review) |
November |
1972 |
|
General |
Solution to Australian Railway Gauge Problem (Wentworth) |
July |
1954 |
|
General |
Speech Kits for Industry Promotion |
September |
1964 |
|
General |
Standard Gauge Lines Would Aid Northern Development |
September |
1962 |
|
General |
Superb Rail System for Little Expenditure (Thomas) |
September |
1972 |
|
General |
Sydney-Perth Standard Service Inaugurated |
January |
1970 |
|
General |
The Commonwealth Takes a Close Look at Rail Problems |
May |
1971 |
|
General |
The Indian Pacific - An Early Appraisal - Part 1 |
April |
1970 |
|
General |
The Indian Pacific - An Early Appraisal - Part 2 |
May |
1970 |
|
General |
The Indian Pacific - An Early Appraisal - Part 3 |
June |
1970 |
|
General |
The Influence Rolling Stock on Better Locomotive Capacity |
December |
1954 |
|
General |
The Pattern of Branch Line Closures |
March |
1971 |
|
General |
Track Material Standards |
March |
1965 |
|
General |
Travel Promotion Tour Precedes Third Indian Pacific |
July |
1973 |
|
General |
Two Systems Sell Air Rights over Rail Tracks |
September |
1958 |
|
General |
Underground Rail Systems Vital to City Development |
June |
1969 |
|
General |
Urban Transportation - Its Finance & Organisation |
January |
1968 |
|
General |
Wanted - A New Deal in Railway Financing |
December |
1960 |
|
General |
Watch the Big Tonnage Roll! |
September |
1969 |
|
General |
Weed Eradication Still Vital Task |
December |
1961 |
|
General |
What are Motive Power Trends? (Diesel Review) |
April |
1964 |
|
General |
What Australia is Doing with Radio Train Control |
December |
1954 |
|
General |
What Does the Future Hold for Australia's Railways? |
December |
1967 |
|
General |
Where Will the Cost Spiral End? (Industry Review) |
May |
1972 |
|
General |
Why Railway Engineers are Hard to Obtain |
August |
1957 |
|
General |
Wide Expansion of Aluminium for Rapid Transit |
February |
1972 |
|
General |
Will A.C. Supersede D.C. for Traction Needs? |
July |
1960 |
|
Manufacturing |
""Explorer"" Loco Meets Wide Specification Range (BTH) |
December |
1959 |
|
Manufacturing |
""Per-Way"" must be the ""Safe Way"" |
August |
1956 |
|
Manufacturing |
£300,000 Wheel and Tyre Plant Opened |
November |
1963 |
|
Manufacturing |
2-Deck Trains use Modern Continental Pantograph |
August |
1974 |
|
Manufacturing |
75 Years Service to the Rail Industry |
May |
1963 |
|
Manufacturing |
A.C. Power in New Alco Models |
January |
1966 |
|
Manufacturing |
Alloys Give Extra Payload for Freight Cars |
February |
1958 |
|
Manufacturing |
Aluminium Rolling Stock Trends |
August |
1963 |
|
Manufacturing |
Ambulance Railcar (D. Wickham & Co. Ltd., UK) |
November |
1973 |
|
Manufacturing |
Australian Built Passenger Coaches for Cambodian Railways |
March |
1960 |
|
Manufacturing |
Availability of Timber for Sleeper Needs |
October |
1973 |
|
Manufacturing |
Braking Comes Next to Motive Power on Fast Runs |
May |
1956 |
|
Manufacturing |
British Ticket Machine (Ticket Equipment UK) |
July |
1974 |
|
Manufacturing |
British Transducers Gain Wide Acceptance |
November |
1974 |
|
Manufacturing |
Budd Disc Brakes in Passenger Service |
February |
1961 |
|
Manufacturing |
Car Loading Ramp (Grosse Equipment & Design Service) |
February |
1973 |
|
Manufacturing |
Cast Steel Wheel Plant Opened |
April |
1963 |
|
Manufacturing |
Caterpillar Widens Range of Locally Produced Units |
June |
1960 |
|
Manufacturing |
Century of Diesels Go Under the Hook (Clyde) |
February |
1960 |
|
Manufacturing |
Clyde's Engine Modernisation Plant |
September |
1967 |
|
Manufacturing |
Colombo Plan Offers New Vistas for Australian Car Builders |
November |
1958 |
|
Manufacturing |
Compact High Flow Air Cleaners and Filters |
January |
1966 |
|
Manufacturing |
Composite Sleepers in France |
May |
1957 |
|
Manufacturing |
Concrete Sleepers in Siding Installation (Humes) |
May |
1961 |
|
Manufacturing |
Cooled Container with In-Built Freezer |
November |
1956 |
|
Manufacturing |
Cooling System Redesigned to Suit Tropical Conditions |
July |
1971 |
|
Manufacturing |
Custom-built Containers and Pallets |
August |
1969 |
|
Manufacturing |
Cutting Per-Way Costs by Mechanisation |
February |
1957 |
|
Manufacturing |
Desideratums in Passenger Car Bogie Design |
March |
1956 |
|
Manufacturing |
Diesel Electric Travelling Training School |
March |
1952 |
|
Manufacturing |
Diesel Loco Cooling Radiators |
December |
1963 |
|
Manufacturing |
Diesel Loco Engine Detective Cuts Shore Service Tests |
August |
1958 |
|
Manufacturing |
Digital Indicator (Pye Ether Ltd., UK) |
November |
1973 |
|
Manufacturing |
Draft gear Developments |
April |
1965 |
|
Manufacturing |
Electric Furnace Improves Steel Production |
May |
1966 |
|
Manufacturing |
Electric Tail Lamp (Bardic Systems, UK) |
February |
1974 |
|
Manufacturing |
English Electric Diesel Engine Range Up-rated |
October |
1969 |
|
Manufacturing |
Equipment Supplier's New Factory (Ralph Symonds) |
January |
1960 |
|
Manufacturing |
Forklift for Loading Trailers, Railcars (Clark Equipment) |
April |
1974 |
|
Manufacturing |
Freight Vehicles Delivered on Standard Gauge Route |
August |
1970 |
|
Manufacturing |
French Track Equipment (The Anciens Establissments, L. Geismar) Part 1 |
March |
1973 |
|
Manufacturing |
French Track Equipment (The Anciens Establissments, L. Geismar) Part 2 |
June |
1973 |
|
Manufacturing |
From Bolivian Highlands to Australian Plains (Sulzer) |
December |
1958 |
|
Manufacturing |
G.E. Universal Loco Range Now Available |
August |
1961 |
|
Manufacturing |
Gang-Nail Plates Overcome Sleeping Splitting |
December |
1971 |
|
Manufacturing |
GE Enters Higher Horsepower Field |
August |
1967 |
|
Manufacturing |
General Motors' Diesels Extend Power Range |
January |
1960 |
|
Manufacturing |
GM Builds 25,000th Diesel Loco |
March |
1963 |
|
Manufacturing |
GM's 1950 h.p. Export Model |
April |
1959 |
|
Manufacturing |
GM's Export Giant |
December |
1963 |
|
Manufacturing |
GM's New Light-weight Diesel |
October |
1959 |
|
Manufacturing |
Greater Reliability in Latest EMD Range |
September |
1972 |
|
Manufacturing |
Hard Chrome Plating for Diesel Loco Crankshaft |
November |
1959 |
|
Manufacturing |
High Current Resistor (Cressall Manufacturing, UK) |
February |
1974 |
|
Manufacturing |
High Speed Tamper Now Available |
May |
1965 |
|
Manufacturing |
High Voltage Switchboards (MTE Systems Ltd.) |
July |
1973 |
|
Manufacturing |
Higher Powered Diesels |
October |
1965 |
|
Manufacturing |
How Sleepers are Treated to Obtain Longer Usage (E.R. Fogl) |
October |
1973 |
|
Manufacturing |
Hydraulic Couplings (P.B.R. Industrial Co.) |
February |
1974 |
|
Manufacturing |
Impregnated Sleepers Solve North West Borer Menace |
December |
1974 |
|
Manufacturing |
Improved Braking Characteristics (Allied Friction Products) |
March |
1973 |
|
Manufacturing |
Infra Red Technology to reduce Breakdowns |
August |
1974 |
|
Manufacturing |
In-transit P.A. System (Nelson Tanslev, U.K.) |
February |
1974 |
|
Manufacturing |
Large Lifting Magnet (Jones & Rickard) |
April |
1974 |
|
Manufacturing |
Liquid Air Refrigeration for Rail Use |
August |
1964 |
|
Manufacturing |
Liquid Gaskets (Bestobell Industrial Plastics) |
July |
1973 |
|
Manufacturing |
Loco-mounted Rail and Flange Lubricator |
April |
1964 |
|
Manufacturing |
Low Cost Container System (Steadman) |
March |
1967 |
|
Manufacturing |
Low Cost Work Platform (Abbey Engineering) |
April |
1974 |
|
Manufacturing |
Manufacturer Extends Test Facilities (Hadfields) |
August |
1972 |
|
Manufacturing |
Mechanical Stokers Widen Steam Loco Availability |
August |
1959 |
|
Manufacturing |
Miller Cylinders (PBR Industrial Co.) |
July |
1973 |
|
Manufacturing |
Modern Developments in Rail Welding Techniques |
July |
1969 |
|
Manufacturing |
New £4m. Stainless Steel Plant (Commonwealth Steel) |
May |
1960 |
|
Manufacturing |
New Alco 251 Diesel Engine |
February |
1957 |
|
Manufacturing |
New Assembly Shop to Speed Diesel-Electric Program |
December |
1951 |
|
Manufacturing |
New British Earthmoving Equipment |
August |
1954 |
|
Manufacturing |
New Mechanical Units Speed Track Maintenance |
January |
1952 |
|
Manufacturing |
New Plant for Track Equipment Manufacturer |
April |
1972 |
|
Manufacturing |
New Trends in Staff Training Schools |
March |
1952 |
|
Manufacturing |
Numberically Controlled Drilling Machine (Wickman) |
August |
1974 |
|
Manufacturing |
Packaged Air-conditioning (McColl Electric Works, Vic.) |
November |
1973 |
|
Manufacturing |
Photogrammetry - Electronic Aid for Services |
June |
1967 |
|
Manufacturing |
Pressure Treatment of Sleepers |
December |
1970 |
|
Manufacturing |
Prevention of Wheel Slip by Chemical Treatment |
March |
1969 |
|
Manufacturing |
Programmable Calculators (Tektonix Australia) |
April |
1974 |
|
Manufacturing |
PVC Weight Advantage in ESR Carriages |
April |
1974 |
|
Manufacturing |
Rail ""Pipeline"" Would Lower Cost of Natural Gas |
August |
1971 |
|
Manufacturing |
Rail Cambering Beats Shrinkage Problem |
March |
1964 |
|
Manufacturing |
Rail End Straightener (Greenside Hydraulics, UK) |
July |
1974 |
|
Manufacturing |
Rail Equipment Factory Opened (Sonnerdale) |
April |
1961 |
|
Manufacturing |
Rail Tensor (Greenside Hydraulics, UK) |
June |
1974 |
|
Manufacturing |
Rail-borne Track Computer (Data General) |
November |
1974 |
|
Manufacturing |
Railroad Crane (Ernest Holmes Co., USA) |
November |
1973 |
|
Manufacturing |
RDC - A Modern Day Success Story (Budd) |
April |
1961 |
|
Manufacturing |
Reclaiming Worn Rails with Metal-Arc Welding |
May |
1971 |
|
Manufacturing |
Retention Toilet (Stone-McColl Rail Products) |
February |
1973 |
|
Manufacturing |
Silverton Group Expends Rail Activities |
September |
1970 |
|
Manufacturing |
Sixty Years of Service (Westinghouse Brake) |
December |
1972 |
|
Manufacturing |
Sleeper Usage in Australia and New Zealand (E. Ross Gordon) |
October |
1973 |
|
Manufacturing |
Snow-shooting Refrigeration (Carba Aust. Ltd.) |
April |
1973 |
|
Manufacturing |
Specialising in Container Assembly (Rheem) |
July |
1961 |
|
Manufacturing |
Stainless Steel Brings New Look |
October |
1967 |
|
Manufacturing |
Stainless Steel in Rolling Stock Construction |
August |
1962 |
|
Manufacturing |
Stepping up Transformer Production |
December |
1956 |
|
Manufacturing |
Structural Use of Stainless Steel in Rail Vehicles |
March |
1969 |
|
Manufacturing |
Teflon Hose (PBR Industrial Co) |
July |
1974 |
|
Manufacturing |
Test Rig for Air Conditioning Equipment |
August |
1968 |
|
Manufacturing |
Torque Multiplier (Selson Sales) |
August |
1974 |
|
Manufacturing |
Track Lifting Machine (Greenside Hydraulics, UK) |
May |
1974 |
|
Manufacturing |
Track Maintenance Equipment Range Expanded |
August |
1974 |
|
Manufacturing |
Tulloch to Build Diesel Locos |
November |
1957 |
|
Manufacturing |
Turbocharging Boosts Diesel Efficiency |
November |
1963 |
|
Manufacturing |
Ultra Violet Water Steriliser (Stone-Platt Crawley) |
April |
1973 |
|
Manufacturing |
Underframeless Tank Car |
August |
1963 |
|
Manufacturing |
Uprated Engines, Alternators in New EMD Range |
February |
1966 |
|
Manufacturing |
Useful Role for Aluminium in Railway Car Construction |
December |
1957 |
|
Manufacturing |
What's New in Rail Fastenings |
May |
1962 |
|
Manufacturing |
Widening Use of Stainless Steel for Rolling Stock |
December |
1971 |
|
Manufacturing |
World's Largest Rail Vehicle |
November |
1970 |
|
Overseas |
""Europ"" Plan Control for Inter-system S.G. Services |
August |
1958 |
|
Overseas |
1000 Diesel Engines for British Railways |
February |
1965 |
|
Overseas |
A New Train is Born (General Motors) |
January |
1955 |
|
Overseas |
Air Cushion Monorail Feature in Aerotrain |
January |
1966 |
|
Overseas |
Aluminium Rolling Stock for Victoria Line |
October |
1968 |
|
Overseas |
Australian-built Passenger Cars for Vietnam |
October |
1963 |
|
Overseas |
Automatic Running Equipment for London Tube |
July |
1965 |
|
Overseas |
Bay Area Rapid Transit Project on Schedule |
September |
1968 |
|
Overseas |
Big Cities Must Use Mass Transit Services |
March |
1965 |
|
Overseas |
Blueprint for Tomorrow's Transit System (BART) |
April |
1967 |
|
Overseas |
British Rail Plans for the Future |
November |
1968 |
|
Overseas |
British Railways Expands Railcar Fleet |
May |
1953 |
|
Overseas |
Can This Loco Match Local Requirements? |
March |
1962 |
|
Overseas |
Centenary of a Memorable Rail Link-up (USA) |
May |
1969 |
|
Overseas |
Computer Techniques Cut Timetable Complication |
August |
1963 |
|
Overseas |
Computer-equipped Hump Yard |
July |
1966 |
|
Overseas |
Developments in Guided Land Transport Techniques |
August |
1968 |
|
Overseas |
Diesel Engine's 100-hour Test (France) |
May |
1956 |
|
Overseas |
ECAFE Conference Report |
March |
1965 |
|
Overseas |
Electric or Hydraulic Transmission for BR? |
May |
1966 |
|
Overseas |
Electric Subway Cars for Toronto, Canada |
March |
1953 |
|
Overseas |
English Electric Delivers 2000th Engine to BR |
September |
1965 |
|
Overseas |
Equal Treatment Needed for World Rail Survival |
November |
1963 |
|
Overseas |
Euston - Europe's Most Modern Passenger Terminal |
September |
1969 |
|
Overseas |
Fell Diesel Locomotive for British Railways |
July |
1952 |
|
Overseas |
Flexivan Gives 4-Minute Transfer from Road to Rail |
October |
1957 |
|
Overseas |
French Railways Set the Pace |
June |
1955 |
|
Overseas |
Gas Turbines Tested for Commuter Services |
January |
1968 |
|
Overseas |
Gas-Turbine Locos More Economical than Diesel (USA) |
February |
1957 |
|
Overseas |
German Manufacturer Builds Diesel-Hydraulic Locos for USA |
September |
1961 |
|
Overseas |
Guided Radar or ""Wiggly Wire"" |
December |
1968 |
|
Overseas |
High Powered Diesel Locomotive Developments |
May |
1969 |
|
Overseas |
How Healthy is Rail Passenger Traffic in USA? |
November |
1962 |
|
Overseas |
Is Road Transport Inimical to the Railways Future (USA) |
July |
1953 |
|
Overseas |
Japan's New Tokkaido Line |
February |
1964 |
|
Overseas |
Let's Be Cautious About Monorails |
November |
1964 |
|
Overseas |
London Transport Test Automatic Trains |
January |
1964 |
|
Overseas |
London's New Underground (Victoria Line) |
July |
1964 |
|
Overseas |
Low Passenger Density in Luxury Train (South Africa) |
June |
1969 |
|
Overseas |
Lowering Cost of Railway Electrification (France) |
March |
1956 |
|
Overseas |
Machines Streamline Ticket Sales (USA) |
August |
1954 |
|
Overseas |
Magnetic Suspension for Ultra-high Speed Trains |
December |
1969 |
|
Overseas |
Maximum Speed: 100 m.p.h. |
October |
1966 |
|
Overseas |
Minister Reports on Overseas Developments - Part 1 |
October |
1962 |
|
Overseas |
Minister Reports on Overseas Developments - Part 2 |
November |
1962 |
|
Overseas |
Montreal's New Subway Rolls on Rubber Tyres |
November |
1965 |
|
Overseas |
More Movement Space in Underground Trains |
March |
1971 |
|
Overseas |
Moscow's Electric Trains |
August |
1968 |
|
Overseas |
Most Powerful Single-engined Diesel |
September |
1971 |
|
Overseas |
Most Powerful Single-unit Diesel Locomotive |
July |
1968 |
|
Overseas |
New Concept in Passenger Car Design (Budd) |
October |
1956 |
|
Overseas |
New Gas-Turbine for British Railways |
April |
1952 |
|
Overseas |
New German Diesel Train Has Fresh Passenger Appeal |
January |
1955 |
|
Overseas |
New Life for Steam Power (France) |
January |
1952 |
|
Overseas |
Overcoming Wheel Slip on Diesel-Electric Power |
June |
1953 |
|
Overseas |
Overseas Ideas Could Help Solve Our Rail Problems |
August |
1957 |
|
Overseas |
Packing More Punch into D.E. Locos |
April |
1956 |
|
Overseas |
Pendulum car Revived for Test by French Railways |
December |
1957 |
|
Overseas |
Problem Railway has 304 Tunnels in 415 Miles (China) |
February |
1959 |
|
Overseas |
Pushbutton Railroading Speeds Yard Movement (USA) |
June |
1956 |
|
Overseas |
Rail Developments in Great Britain |
November |
1967 |
|
Overseas |
Rail Grinding Train Aids Lower Maintenance Costs |
January |
1958 |
|
Overseas |
Rail Washer Reduces Wheel Slip (USA) |
January |
1958 |
|
Overseas |
Raising the Speed Limit for Four-wheel Vehicles |
April |
1969 |
|
Overseas |
Rapid Transit Cars for Athens |
August |
1952 |
|
Overseas |
Rubber Tyred Trains for Suburban Travel (France) |
January |
1957 |
|
Overseas |
Rubber-tyred Cars for Montreal Subway |
July |
1963 |
|
Overseas |
Special Gauge Measures Wheel Diameters (UK) |
December |
1959 |
|
Overseas |
Stainless Steel Tubular Train for Fast Passenger Runs |
September |
1957 |
|
Overseas |
Steam-Turbine-Electric Loco (Norfolk & Western) |
March |
1955 |
|
Overseas |
Stepping Up Availability of Steam Shunters (USA) |
February |
1952 |
|
Overseas |
Stockholm Underground is ""Blueprint"" Operation |
June |
1965 |
|
Overseas |
Talgo and Train X to Foreshadow Future Trends? |
May |
1953 |
|
Overseas |
TEEM Service Sets Us a fine Example |
January |
1963 |
|
Overseas |
Ticket-issuing Machines Speed Passenger Flow |
October |
1971 |
|
Overseas |
TOFC Service IS Defeating Road Competition |
January |
1955 |
|
Overseas |
Tokyo Expands Underground Network |
April |
1965 |
|
Overseas |
Tracked Hovercraft - Long Distance Train of the Future |
October |
1971 |
|
Overseas |
Traction Control Equipment for Victoria Line |
March |
1969 |
|
Overseas |
Unconventional US Diesel Uses Hydraulic Drive |
December |
1956 |
|
Overseas |
Underwater Transit Tube Completed (San Francisco) |
June |
1969 |
|
Overseas |
US Diesels Highly Successful |
December |
1962 |
|
Overseas |
What Lies Ahead for Rail Travel in the Year 2000? |
July |
1965 |
|
Overseas |
Where is the Limit to Narrow Gauge Loco Design (Sth Africa) |
August |
1953 |
|
Overseas |
World Wide Monorail Systems Observed |
February |
1965 |
|
Overseas |
World's Most Modern Underground Railway (Victoria Line) |
December |
1969 |
|
Surveys, Reviews |
A Testing Time for Top Administration |
October |
1961 |
|
Surveys, Reviews |
A.T.A.C. Report on Australian Railway Operations |
July |
1958 |
|
Surveys, Reviews |
Advertising Spreads the Railways' Sales Story |
September |
1960 |
|
Surveys, Reviews |
Air-conditioning for Long Distance Runs |
July |
1959 |
|
Surveys, Reviews |
Are 4-wheel Freight Cars Retarding ""Speed-Up"" Trends? |
September |
1953 |
|
Surveys, Reviews |
Australia-wide Usage of Small Diesel Units |
March |
1954 |
|
Surveys, Reviews |
Business-Like Approach to Railway Operations |
July |
1959 |
|
Surveys, Reviews |
Capital Works Expansion Boosts Traffic Upsurge |
October |
1961 |
|
Surveys, Reviews |
Diesel Power not Lagging in Australia |
December |
1956 |
|
Surveys, Reviews |
Don't Underestimate the Diesel-Hydraulic |
May |
1961 |
|
Surveys, Reviews |
European Trend in New Diesel-Hydraulic Locos |
September |
1958 |
|
Surveys, Reviews |
Faster Continental Freight Trains |
October |
1958 |
|
Surveys, Reviews |
Green Light for Rehabilitation Program |
October |
1951 |
|
Surveys, Reviews |
Has Microwave Advantages for Australian & NZ Railways? |
October |
1958 |
|
Surveys, Reviews |
Has the Steam Locomotive a Place in the Future? |
January |
1952 |
|
Surveys, Reviews |
Horses and Hand Tools Give Way to Mechanical Means |
August |
1957 |
|
Surveys, Reviews |
How Far Have We Dieselised - How Far to Go? |
March |
1959 |
|
Surveys, Reviews |
Is There a Future for Concrete Sleepers? |
August |
1960 |
|
Surveys, Reviews |
Is There a Piggyback Method Styled for Australia? |
April |
1958 |
|
Surveys, Reviews |
Latest Traffic and Rolling Stock Developments |
October |
1961 |
|
Surveys, Reviews |
More Metropolitan Railways will Avert City Stagnation |
August |
1958 |
|
Surveys, Reviews |
Narrow Gauge Railways Rejuvenate Equipment |
November |
1951 |
|
Surveys, Reviews |
New Motive Power Trends on Mine Railways - Part 1 |
September |
1952 |
|
Surveys, Reviews |
New Motive Power Trends on Mine Railways - Part 2 |
October |
1952 |
|
Surveys, Reviews |
New Outlook on Freight. Methods to Bring Back Trade |
February |
1957 |
|
Surveys, Reviews |
New Promise for Wodonga-Melbourne Gauge Conversion |
July |
1957 |
|
Surveys, Reviews |
Progress Report on Diesel Loco Trends Here |
February |
1961 |
|
Surveys, Reviews |
Punching Personality into Public Relations |
July |
1955 |
|
Surveys, Reviews |
Railcars are the Message Boys of the Steel Roads |
July |
1955 |
|
Surveys, Reviews |
Railways in National Transport Structure |
November |
1955 |
|
Surveys, Reviews |
Repair or Replace Ageing Diesel Motive Power |
August |
1962 |
|
Surveys, Reviews |
Selecting Seating with an Eye for New Business |
October |
1952 |
|
Surveys, Reviews |
Standardised Container Dimensions |
May |
1960 |
|
Surveys, Reviews |
Steam - Its Days are Numbered |
September |
1959 |
|
Surveys, Reviews |
Ten Eventful Years of Railway Progress |
October |
1961 |
|
Surveys, Reviews |
The Age of Diesel Electric Motive Power |
October |
1961 |
|
Surveys, Reviews |
Track Maintenance - The Modern Way |
October |
1960 |
|
Surveys, Reviews |
Traffic Potential of the Albury - Melbourne S.G. Line |
October |
1959 |
|
Surveys, Reviews |
Wanted: A Different Approach to Passenger Services |
November |
1956 |
|
Surveys, Reviews |
Welded Track Cuts Maintenance Costs |
January |
1960 |
|
Surveys, Reviews |
What Are the Claims for Railway Dieselisation? |
December |
1951 |
|
Surveys, Reviews |
What Will 1970's Locomotives Look Like? |
July |
1957 |
|
Surveys, Reviews |
What's Wrong with Railway Publicity? |
June |
1955 |
|
Urban |
Are Interurbans Overlooked? |
August |
1974 |
|
Urban |
BART Nears the Apex (San Francisco Transit) |
September |
1974 |
|
Urban |
Design Policy in a Public Transport Corporation Part 1 |
April |
1974 |
|
Urban |
Design Policy in a Public Transport Corporation Part 2 |
May |
1974 |
|
Urban |
Federal Transport Minister Spells Out Aims for Rail Changes |
April |
1974 |
|
Urban |
Levitation transit Concepts Shown to Australian Rail Chiefs |
February |
1974 |
|
Urban |
Urban Rail Systems top Priority for Mass Transit |
February |
1974 |