CONSTRUCTION OF THE NEW ‘RAL’ HOUSE

 

22nd July 2007

 

 

The above photo shows the acres (well 1/20 acre) of hardwood floating floor that we installed.

 

 

View from the spare bedoom.

 

 

The near complete kitchen on moving day. The stove extractor was installed a few days before this photo was taken but leaked copiously during heavy rain later the same day. The plumber clambered onto the roof (sloping, wet and about 5 m above the ground) while it was still raining / sleeting, covered himself with a tarpaulin, dried everything off and resealed the flue.

 

 

We lit the wood heater as soon as we started moving things into the house, it was less than 10oC inside.

 

 

The girls bathroom getting a serious clean on moving day.

 

BACK TO MENU